Wind Turbine Payback in Manassas Park city, VA

Wind turbine payback in Manassas Park city

No. The turbine wears out before it pays for itself.

At 30 m, the height a home turbine tower usually reaches, the wind in Manassas Park city, VA averages 4.57 m/s (10.2 mph). A 10 kW turbine there would make about 9,763 kWh a year, worth $1,655 at VA's 16.95¢/kWh. Against an installed cost of about $100,000, that is a payback of 60 years, and the turbine is built to last about 20.

What to do in Manassas Park city

A home turbine is not worth buying for savings in Manassas Park city unless your spot is far windier than the county average, 7.3 m/s at the hub against 4.57 m/s here. Per kW, solar panels would make about 1,203 kWh a year here against the turbine's 976, so get a solar quote first.

What would have to change

Against the rest of VA

Manassas Park city is the 1,704th windiest of 3,144 US counties at turbine height; the national middle is 4.79 m/s. The windiest in VA is Northampton County at 7.01 m/s, payback 22 years.

Month by month in Manassas Park city

March is the strongest month here, at 5.42 m/s and about 1,314 kWh. August is the weakest, 3.43 m/s and 346 kWh, so the best month makes 3.8 times the worst. November to March brings in 57% of the year's output in Manassas Park city.

MonthWind at 30 mOutputWorth
January5.34 m/s1,267 kWh$215
February5.45 m/s1,201 kWh$204
March5.42 m/s1,314 kWh$223
April5.18 m/s1,132 kWh$192
May4.33 m/s708 kWh$120
June3.87 m/s489 kWh$83
July3.45 m/s351 kWh$59
August3.43 m/s346 kWh$59
September3.97 m/s527 kWh$89
October4.56 m/s824 kWh$140
November4.90 m/s973 kWh$165
December4.98 m/s1,055 kWh$179

What a taller tower would buy

Measured at 10 m the wind in Manassas Park city averages 3.31 m/s; at 50 m it is 5.31 m/s. That gives a shear exponent of 0.294, typical of ordinary open country. Going from 20 m to 50 m takes output from 6,862 to 14,679 kWh a year, 114% more, before counting the extra cost of the taller tower. Why tower height decides it explains the shear behind these numbers.

Hub heightAverage windOutputPayback
20 m4.06 m/s6,862 kWh86 years
30 m4.57 m/s9,760 kWh60 years
40 m4.97 m/s12,352 kWh48 years
50 m5.31 m/s14,679 kWh40 years

Counties around Manassas Park city

2 of the 6 closest counties are windier at turbine height; the windiest, Falls Church city, averages 5.23 m/s.

Sun versus wind in Manassas Park city

Manassas Park city gets 4.12 kWh of sunshine per square metre a day on average. One kW of solar panels here would make roughly 1,203 kWh a year; one kW of the turbine above makes 976. Kilowatt for kilowatt, panels make 1.2 times as much here as the turbine. Panel output assumes an 80% system performance ratio. Wind or solar runs the same comparison for every county.

How this is worked out

Wind is NASA's Power climate record, the 2001-2025 average at 10 m and 50 m for the county's centre, carried to 30 m with this county's own measured wind shear and spread into hours with a Rayleigh distribution. The turbine is a generic 10 kW, 7 m rotor machine with 10% losses. Cost is $10,000 per kW installed with no tax credit, because the federal one ended in 2025. One county-centre number cannot see your hilltop or your tree line, so treat it as the starting point for a site survey, not a substitute. The full method and its weak spots are in how the numbers are made.