Wind Turbine Payback in Martin County, MN

Wind turbine payback in Martin County

No. The turbine wears out before it pays for itself.

At 30 m, the height a home turbine tower usually reaches, the wind in Martin County, MN averages 6.5 m/s (14.5 mph). A 10 kW turbine there would make about 23,407 kWh a year, worth $3,848 at MN's 16.44¢/kWh. Against an installed cost of about $100,000, that is a payback of 26 years, and the turbine is built to last about 20.

What to do in Martin County

A home turbine is not worth buying for savings in Martin County unless your spot is far windier than the county average, 7.5 m/s at the hub against 6.5 m/s here. Per kW, solar panels would make about 1,168 kWh a year here against the turbine's 2,341, so get a solar quote first.

What would have to change

Against the rest of MN

Martin County is the 208th windiest of 3,144 US counties at turbine height; the national middle is 4.79 m/s. The windiest in MN is Lincoln County at 6.68 m/s, payback 25 years.

Month by month in Martin County

April is the strongest month here, at 7.32 m/s and about 2,409 kWh. August is the weakest, 5.28 m/s and 1,230 kWh, so the best month makes 2.0 times the worst. November to March brings in 46% of the year's output in Martin County.

MonthWind at 30 mOutputWorth
January6.90 m/s2,235 kWh$367
February6.88 m/s2,009 kWh$330
March6.98 m/s2,284 kWh$375
April7.32 m/s2,409 kWh$396
May6.69 m/s2,108 kWh$347
June6.02 m/s1,631 kWh$268
July5.29 m/s1,235 kWh$203
August5.28 m/s1,230 kWh$202
September6.33 m/s1,822 kWh$300
October6.79 m/s2,169 kWh$357
November6.92 m/s2,174 kWh$357
December6.73 m/s2,130 kWh$350

What a taller tower would buy

Measured at 10 m the wind in Martin County averages 5.16 m/s; at 50 m it is 7.24 m/s. That gives a shear exponent of 0.210, typical of ordinary open country. Going from 20 m to 50 m takes output from 19,502 to 28,741 kWh a year, 47% more, before counting the extra cost of the taller tower. Why tower height decides it explains the shear behind these numbers.

Hub heightAverage windOutputPayback
20 m5.97 m/s19,502 kWh31 years
30 m6.5 m/s23,433 kWh26 years
40 m6.91 m/s26,387 kWh23 years
50 m7.24 m/s28,741 kWh21 years

Counties around Martin County

1 of the 6 closest counties is windier at turbine height; the windiest, Jackson County, averages 6.59 m/s.

Sun versus wind in Martin County

Martin County gets 4 kWh of sunshine per square metre a day on average. One kW of solar panels here would make roughly 1,168 kWh a year; one kW of the turbine above makes 2,341. This is one of the rare places where a kilowatt of turbine out-produces a kilowatt of panels, by 2.0 times. Panel output assumes an 80% system performance ratio. Wind or solar runs the same comparison for every county.

How this is worked out

Wind is NASA's Power climate record, the 2001-2025 average at 10 m and 50 m for the county's centre, carried to 30 m with this county's own measured wind shear and spread into hours with a Rayleigh distribution. The turbine is a generic 10 kW, 7 m rotor machine with 10% losses. Cost is $10,000 per kW installed with no tax credit, because the federal one ended in 2025. One county-centre number cannot see your hilltop or your tree line, so treat it as the starting point for a site survey, not a substitute. The full method and its weak spots are in how the numbers are made.