TurbinePayback

Wind Turbine Payback in McCone County, MT

Wind turbine payback in McCone County

No. The turbine wears out before it pays for itself.

At 30 m, the height a home turbine tower usually reaches, the wind in McCone County, MT averages 6.43 m/s (14.4 mph). A 10 kW turbine there would make about 22,891 kWh a year, worth $3,234 at MT's 14.13¢/kWh. Against an installed cost of about $100,000, that is a payback of 31 years, and the turbine is built to last about 20.

What to do in McCone County

A home turbine is not worth buying for savings in McCone County unless your spot is far windier than the county average, 8.2 m/s at the hub against 6.43 m/s here. Per kW, solar panels would make about 1,183 kWh a year here against the turbine's 2,289, so get a solar quote first.

What would have to change

Against the rest of MT

McCone County is the 290th windiest of 3,144 US counties at turbine height; the national middle is 4.79 m/s. The windiest in MT is Fallon County at 6.64 m/s, payback 29 years.

Month by month in McCone County

January is the strongest month here, at 6.91 m/s and about 2,240 kWh. July is the weakest, 5.73 m/s and 1,503 kWh, so the best month makes 1.5 times the worst. November to March brings in 45% of the year's output in McCone County.

MonthWind at 30 mOutputWorth
January6.91 m/s2,240 kWh$317
February6.20 m/s1,628 kWh$230
March6.61 m/s2,057 kWh$291
April6.65 m/s2,012 kWh$284
May6.41 m/s1,933 kWh$273
June6.11 m/s1,684 kWh$238
July5.73 m/s1,503 kWh$212
August5.79 m/s1,542 kWh$218
September6.20 m/s1,744 kWh$246
October6.82 m/s2,185 kWh$309
November6.99 m/s2,216 kWh$313
December6.75 m/s2,141 kWh$303

What a taller tower would buy

Measured at 10 m the wind in McCone County averages 5.13 m/s; at 50 m it is 7.14 m/s. That gives a shear exponent of 0.205, typical of ordinary open country. Going from 20 m to 50 m takes output from 19,092 to 28,038 kWh a year, 47% more, before counting the extra cost of the taller tower. Why tower height decides it explains the shear behind these numbers.

Hub heightAverage windOutputPayback
20 m5.92 m/s19,092 kWh37 years
30 m6.43 m/s22,892 kWh31 years
40 m6.82 m/s25,752 kWh28 years
50 m7.14 m/s28,038 kWh25 years

Counties around McCone County

1 of the 6 closest counties is windier at turbine height; the windiest, Dawson County, averages 6.49 m/s.

Sun versus wind in McCone County

McCone County gets 4.05 kWh of sunshine per square metre a day on average. One kW of solar panels here would make roughly 1,183 kWh a year; one kW of the turbine above makes 2,289. This is one of the rare places where a kilowatt of turbine out-produces a kilowatt of panels, by 1.9 times. Panel output assumes an 80% system performance ratio. Wind or solar runs the same comparison for every county.

How this is worked out

Wind is NASA's Power climate record, the 2001-2025 average at 10 m and 50 m for the county's centre, carried to 30 m with this county's own measured wind shear and spread into hours with a Rayleigh distribution. The turbine is a generic 10 kW, 7 m rotor machine with 10% losses. Cost is $10,000 per kW installed with no tax credit, because the federal one ended in 2025. One county-centre number cannot see your hilltop or your tree line, so treat it as the starting point for a site survey, not a substitute. The full method and its weak spots are in how the numbers are made.