TurbinePayback

Wind Turbine Payback in Meade County, SD

Wind turbine payback in Meade County

No. The turbine wears out before it pays for itself.

At 30 m, the height a home turbine tower usually reaches, the wind in Meade County, SD averages 6.32 m/s (14.1 mph). A 10 kW turbine there would make about 22,077 kWh a year, worth $3,219 at SD's 14.58¢/kWh. Against an installed cost of about $100,000, that is a payback of 31 years, and the turbine is built to last about 20.

What to do in Meade County

A home turbine is not worth buying for savings in Meade County unless your spot is far windier than the county average, 8.1 m/s at the hub against 6.32 m/s here. Per kW, solar panels would make about 1,253 kWh a year here against the turbine's 2,208, so get a solar quote first.

What would have to change

Against the rest of SD

Meade County is the 452nd windiest of 3,144 US counties at turbine height; the national middle is 4.79 m/s. The windiest in SD is Todd County at 6.77 m/s, payback 27 years.

Month by month in Meade County

January is the strongest month here, at 6.73 m/s and about 2,129 kWh. July is the weakest, 5.60 m/s and 1,422 kWh, so the best month makes 1.5 times the worst. November to March brings in 44% of the year's output in Meade County.

MonthWind at 30 mOutputWorth
January6.73 m/s2,129 kWh$310
February6.29 m/s1,675 kWh$244
March6.60 m/s2,051 kWh$299
April6.68 m/s2,034 kWh$297
May6.47 m/s1,967 kWh$287
June5.90 m/s1,560 kWh$227
July5.60 m/s1,422 kWh$207
August5.66 m/s1,460 kWh$213
September6.18 m/s1,729 kWh$252
October6.70 m/s2,113 kWh$308
November6.45 m/s1,893 kWh$276
December6.49 m/s1,984 kWh$289

What a taller tower would buy

Measured at 10 m the wind in Meade County averages 5 m/s; at 50 m it is 7.04 m/s. That gives a shear exponent of 0.213, typical of ordinary open country. Going from 20 m to 50 m takes output from 18,166 to 27,328 kWh a year, 50% more, before counting the extra cost of the taller tower. Why tower height decides it explains the shear behind these numbers.

Hub heightAverage windOutputPayback
20 m5.79 m/s18,166 kWh38 years
30 m6.31 m/s22,034 kWh31 years
40 m6.71 m/s24,971 kWh28 years
50 m7.04 m/s27,328 kWh25 years

Counties around Meade County

2 of the 6 closest counties are windier at turbine height; the windiest, Perkins County, averages 6.58 m/s.

Sun versus wind in Meade County

Meade County gets 4.29 kWh of sunshine per square metre a day on average. One kW of solar panels here would make roughly 1,253 kWh a year; one kW of the turbine above makes 2,208. This is one of the rare places where a kilowatt of turbine out-produces a kilowatt of panels, by 1.8 times. Panel output assumes an 80% system performance ratio. Wind or solar runs the same comparison for every county.

How this is worked out

Wind is NASA's Power climate record, the 2001-2025 average at 10 m and 50 m for the county's centre, carried to 30 m with this county's own measured wind shear and spread into hours with a Rayleigh distribution. The turbine is a generic 10 kW, 7 m rotor machine with 10% losses. Cost is $10,000 per kW installed with no tax credit, because the federal one ended in 2025. One county-centre number cannot see your hilltop or your tree line, so treat it as the starting point for a site survey, not a substitute. The full method and its weak spots are in how the numbers are made.