Wind turbine payback in Mendocino County

No. The turbine wears out before it pays for itself.

At 30 m, the height a home turbine tower usually reaches, the wind in Mendocino County, CA averages 3.87 m/s (8.7 mph). A 10 kW turbine there would make about 5,942 kWh a year, worth $1,936 at CA's 32.58¢/kWh. Against an installed cost of about $100,000, that is a payback of 52 years, and the turbine is built to last about 20.

What to do in Mendocino County

A home turbine is not worth buying for savings in Mendocino County unless your spot is far windier than the county average, 5.4 m/s at the hub against 3.87 m/s here. Per kW, solar panels would make about 1,437 kWh a year here against the turbine's 594, so get a solar quote first.

What would have to change

Against the rest of CA

Mendocino County is the 2,157th windiest of 3,144 US counties at turbine height; the national middle is 4.79 m/s. The windiest in CA is San Francisco County at 6.53 m/s, payback 13 years.

Month by month in Mendocino County

June is the strongest month here, at 4.37 m/s and about 703 kWh. August is the weakest, 3.36 m/s and 323 kWh, so the best month makes 2.2 times the worst. November to March brings in 46% of the year's output in Mendocino County.

MonthWind at 30 mOutputWorth
January3.85 m/s495 kWh$161
February4.20 m/s583 kWh$190
March4.07 m/s589 kWh$192
April3.97 m/s529 kWh$172
May4.03 m/s574 kWh$187
June4.37 m/s703 kWh$229
July3.60 m/s401 kWh$131
August3.36 m/s323 kWh$105
September3.49 m/s352 kWh$115
October3.58 m/s395 kWh$129
November3.73 m/s436 kWh$142
December4.26 m/s675 kWh$220

What a taller tower would buy

Measured at 10 m the wind in Mendocino County averages 3.05 m/s; at 50 m it is 4.33 m/s. That gives a shear exponent of 0.218, typical of ordinary open country. Going from 20 m to 50 m takes output from 4,513 to 8,346 kWh a year, 85% more, before counting the extra cost of the taller tower. Why tower height decides it explains the shear behind these numbers.

Hub heightAverage windOutputPayback
20 m3.55 m/s4,513 kWh68 years
30 m3.87 m/s5,959 kWh52 years
40 m4.12 m/s7,218 kWh43 years
50 m4.33 m/s8,346 kWh37 years

Counties around Mendocino County

4 of the 6 closest counties are windier at turbine height; the windiest, Sonoma County, averages 4.66 m/s.

Sun versus wind in Mendocino County

Mendocino County gets 4.92 kWh of sunshine per square metre a day on average. One kW of solar panels here would make roughly 1,437 kWh a year; one kW of the turbine above makes 594. Kilowatt for kilowatt, panels make 2.4 times as much here as the turbine. Panel output assumes an 80% system performance ratio. Wind or solar runs the same comparison for every county.

How this is worked out

Wind is NASA's Power climate record, the 2001-2025 average at 10 m and 50 m for the county's centre, carried to 30 m with this county's own measured wind shear and spread into hours with a Rayleigh distribution. The turbine is a generic 10 kW, 7 m rotor machine with 10% losses. Cost is $10,000 per kW installed with no tax credit, because the federal one ended in 2025. One county-centre number cannot see your hilltop or your tree line, so treat it as the starting point for a site survey, not a substitute. The full method and its weak spots are in how the numbers are made.