TurbinePayback

Wind Turbine Payback in Nemaha County, NE

Wind turbine payback in Nemaha County

No. The turbine wears out before it pays for itself.

At 30 m, the height a home turbine tower usually reaches, the wind in Nemaha County, NE averages 6.17 m/s (13.8 mph). A 10 kW turbine there would make about 20,965 kWh a year, worth $2,709 at NE's 12.92¢/kWh. Against an installed cost of about $100,000, that is a payback of 37 years, and the turbine is built to last about 20.

What to do in Nemaha County

A home turbine is not worth buying for savings in Nemaha County unless your spot is far windier than the county average, 8.8 m/s at the hub against 6.17 m/s here. Per kW, solar panels would make about 1,244 kWh a year here against the turbine's 2,097, so get a solar quote first.

What would have to change

Against the rest of NE

Nemaha County is the 608th windiest of 3,144 US counties at turbine height; the national middle is 4.79 m/s. The windiest in NE is Cherry County at 6.83 m/s, payback 30 years.

Month by month in Nemaha County

April is the strongest month here, at 7.07 m/s and about 2,266 kWh. August is the weakest, 4.91 m/s and 1,013 kWh, so the best month makes 2.2 times the worst. November to March brings in 46% of the year's output in Nemaha County.

MonthWind at 30 mOutputWorth
January6.43 m/s1,946 kWh$251
February6.43 m/s1,758 kWh$227
March6.79 m/s2,168 kWh$280
April7.07 m/s2,266 kWh$293
May6.32 m/s1,873 kWh$242
June5.81 m/s1,504 kWh$194
July5.01 m/s1,069 kWh$138
August4.91 m/s1,013 kWh$131
September5.91 m/s1,563 kWh$202
October6.42 m/s1,940 kWh$251
November6.61 m/s1,991 kWh$257
December6.31 m/s1,868 kWh$241

What a taller tower would buy

Measured at 10 m the wind in Nemaha County averages 4.81 m/s; at 50 m it is 6.92 m/s. That gives a shear exponent of 0.226, typical of ordinary open country. Going from 20 m to 50 m takes output from 16,948 to 26,469 kWh a year, 56% more, before counting the extra cost of the taller tower. Why tower height decides it explains the shear behind these numbers.

Hub heightAverage windOutputPayback
20 m5.63 m/s16,948 kWh46 years
30 m6.17 m/s20,931 kWh37 years
40 m6.58 m/s23,993 kWh32 years
50 m6.92 m/s26,469 kWh29 years

Counties around Nemaha County

4 of the 6 closest counties are windier at turbine height; the windiest, Pawnee County, averages 6.34 m/s.

Sun versus wind in Nemaha County

Nemaha County gets 4.26 kWh of sunshine per square metre a day on average. One kW of solar panels here would make roughly 1,244 kWh a year; one kW of the turbine above makes 2,097. This is one of the rare places where a kilowatt of turbine out-produces a kilowatt of panels, by 1.7 times. Panel output assumes an 80% system performance ratio. Wind or solar runs the same comparison for every county.

How this is worked out

Wind is NASA's Power climate record, the 2001-2025 average at 10 m and 50 m for the county's centre, carried to 30 m with this county's own measured wind shear and spread into hours with a Rayleigh distribution. The turbine is a generic 10 kW, 7 m rotor machine with 10% losses. Cost is $10,000 per kW installed with no tax credit, because the federal one ended in 2025. One county-centre number cannot see your hilltop or your tree line, so treat it as the starting point for a site survey, not a substitute. The full method and its weak spots are in how the numbers are made.