TurbinePayback

Wind Turbine Payback in New Madrid County, MO

Wind turbine payback in New Madrid County

No. The turbine wears out before it pays for itself.

At 30 m, the height a home turbine tower usually reaches, the wind in New Madrid County, MO averages 5.54 m/s (12.4 mph). A 10 kW turbine there would make about 16,326 kWh a year, worth $2,331 at MO's 14.28¢/kWh. Against an installed cost of about $100,000, that is a payback of 43 years, and the turbine is built to last about 20.

What to do in New Madrid County

A home turbine is not worth buying for savings in New Madrid County unless your spot is far windier than the county average, 8.2 m/s at the hub against 5.54 m/s here. Per kW, solar panels would make about 1,276 kWh a year here against the turbine's 1,633, so get a solar quote first.

What would have to change

Against the rest of MO

New Madrid County is the 1,186th windiest of 3,144 US counties at turbine height; the national middle is 4.79 m/s. The windiest in MO is Atchison County at 6.17 m/s, payback 33 years.

Month by month in New Madrid County

April is the strongest month here, at 6.66 m/s and about 2,020 kWh. July is the weakest, 4.07 m/s and 590 kWh, so the best month makes 3.4 times the worst. November to March brings in 53% of the year's output in New Madrid County.

MonthWind at 30 mOutputWorth
January6.24 m/s1,827 kWh$261
February6.32 m/s1,695 kWh$242
March6.49 m/s1,982 kWh$283
April6.66 m/s2,020 kWh$288
May5.62 m/s1,438 kWh$205
June4.65 m/s843 kWh$120
July4.07 m/s590 kWh$84
August4.12 m/s610 kWh$87
September4.71 m/s875 kWh$125
October5.56 m/s1,400 kWh$200
November6.11 m/s1,687 kWh$241
December6.07 m/s1,721 kWh$246

What a taller tower would buy

Measured at 10 m the wind in New Madrid County averages 4.27 m/s; at 50 m it is 6.26 m/s. That gives a shear exponent of 0.238, typical of ordinary open country. Going from 20 m to 50 m takes output from 12,761 to 21,632 kWh a year, 70% more, before counting the extra cost of the taller tower. Why tower height decides it explains the shear behind these numbers.

Hub heightAverage windOutputPayback
20 m5.03 m/s12,761 kWh55 years
30 m5.54 m/s16,351 kWh43 years
40 m5.94 m/s19,232 kWh36 years
50 m6.26 m/s21,632 kWh32 years

Counties around New Madrid County

None of the 6 closest counties is windier than New Madrid County.

Sun versus wind in New Madrid County

New Madrid County gets 4.37 kWh of sunshine per square metre a day on average. One kW of solar panels here would make roughly 1,276 kWh a year; one kW of the turbine above makes 1,633. This is one of the rare places where a kilowatt of turbine out-produces a kilowatt of panels, by 1.3 times. Panel output assumes an 80% system performance ratio. Wind or solar runs the same comparison for every county.

How this is worked out

Wind is NASA's Power climate record, the 2001-2025 average at 10 m and 50 m for the county's centre, carried to 30 m with this county's own measured wind shear and spread into hours with a Rayleigh distribution. The turbine is a generic 10 kW, 7 m rotor machine with 10% losses. Cost is $10,000 per kW installed with no tax credit, because the federal one ended in 2025. One county-centre number cannot see your hilltop or your tree line, so treat it as the starting point for a site survey, not a substitute. The full method and its weak spots are in how the numbers are made.