No. The turbine wears out before it pays for itself.

At 30 m, the height a home turbine tower usually reaches, the wind in Newton County, GA averages 3.35 m/s (7.5 mph). A 10 kW turbine there would make about 3,757 kWh a year, worth $582 at GA's 15.48¢/kWh. Against an installed cost of about $100,000, that is a payback of over 100 years, and the turbine is built to last about 20.

What to do in Newton County

A home turbine is not worth buying for savings in Newton County unless your spot is far windier than the county average, 7.8 m/s at the hub against 3.35 m/s here. Per kW, solar panels would make about 1,332 kWh a year here against the turbine's 376, so get a solar quote first.

What would have to change

Against the rest of GA

Newton County is the 2,683rd windiest of 3,144 US counties at turbine height; the national middle is 4.79 m/s. The windiest in GA is Glynn County at 5.08 m/s, payback 49 years.

Month by month in Newton County

March is the strongest month here, at 3.91 m/s and about 522 kWh. August is the weakest, 2.55 m/s and 123 kWh, so the best month makes 4.2 times the worst. November to March brings in 57% of the year's output in Newton County.

MonthWind at 30 mOutputWorth
January3.84 m/s493 kWh$76
February3.84 m/s445 kWh$69
March3.91 m/s522 kWh$81
April3.82 m/s468 kWh$72
May3.28 m/s299 kWh$46
June2.80 m/s168 kWh$26
July2.60 m/s134 kWh$21
August2.55 m/s123 kWh$19
September3.02 m/s220 kWh$34
October3.32 m/s311 kWh$48
November3.55 m/s372 kWh$58
December3.64 m/s416 kWh$64

What a taller tower would buy

Measured at 10 m the wind in Newton County averages 2.12 m/s; at 50 m it is 4.14 m/s. That gives a shear exponent of 0.416, typical of rough, sheltered ground: trees or buildings slow the low wind a lot. Going from 20 m to 50 m takes output from 2,119 to 7,301 kWh a year, 245% more, before counting the extra cost of the taller tower. Why tower height decides it explains the shear behind these numbers.

Hub heightAverage windOutputPayback
20 m2.83 m/s2,119 kWhover 100 years
30 m3.35 m/s3,748 kWhover 100 years
40 m3.77 m/s5,491 kWhover 100 years
50 m4.14 m/s7,301 kWh89 years

Counties around Newton County

1 of the 6 closest counties is windier at turbine height; the windiest, Henry County, averages 3.86 m/s.

Sun versus wind in Newton County

Newton County gets 4.56 kWh of sunshine per square metre a day on average. One kW of solar panels here would make roughly 1,332 kWh a year; one kW of the turbine above makes 376. Kilowatt for kilowatt, panels make 3.5 times as much here as the turbine. Panel output assumes an 80% system performance ratio. Wind or solar runs the same comparison for every county.

How this is worked out

Wind is NASA's Power climate record, the 2001-2025 average at 10 m and 50 m for the county's centre, carried to 30 m with this county's own measured wind shear and spread into hours with a Rayleigh distribution. The turbine is a generic 10 kW, 7 m rotor machine with 10% losses. Cost is $10,000 per kW installed with no tax credit, because the federal one ended in 2025. One county-centre number cannot see your hilltop or your tree line, so treat it as the starting point for a site survey, not a substitute. The full method and its weak spots are in how the numbers are made.