TurbinePayback

Wind Turbine Payback in Osage County, KS

Wind turbine payback in Osage County

No. The turbine wears out before it pays for itself.

At 30 m, the height a home turbine tower usually reaches, the wind in Osage County, KS averages 6.22 m/s (13.9 mph). A 10 kW turbine there would make about 21,336 kWh a year, worth $3,256 at KS's 15.26¢/kWh. Against an installed cost of about $100,000, that is a payback of 31 years, and the turbine is built to last about 20.

What to do in Osage County

A home turbine is not worth buying for savings in Osage County unless your spot is far windier than the county average, 7.8 m/s at the hub against 6.22 m/s here. Per kW, solar panels would make about 1,276 kWh a year here against the turbine's 2,134, so get a solar quote first.

What would have to change

Against the rest of KS

Osage County is the 566th windiest of 3,144 US counties at turbine height; the national middle is 4.79 m/s. The windiest in KS is Edwards County at 6.68 m/s, payback 27 years.

Month by month in Osage County

April is the strongest month here, at 7.24 m/s and about 2,362 kWh. August is the weakest, 4.94 m/s and 1,032 kWh, so the best month makes 2.3 times the worst. November to March brings in 47% of the year's output in Osage County.

MonthWind at 30 mOutputWorth
January6.51 m/s1,994 kWh$304
February6.52 m/s1,806 kWh$276
March6.95 m/s2,269 kWh$346
April7.24 m/s2,362 kWh$360
May6.28 m/s1,849 kWh$282
June5.97 m/s1,599 kWh$244
July5.03 m/s1,083 kWh$165
August4.94 m/s1,032 kWh$157
September5.68 m/s1,427 kWh$218
October6.48 m/s1,977 kWh$302
November6.74 m/s2,069 kWh$316
December6.44 m/s1,949 kWh$297

What a taller tower would buy

Measured at 10 m the wind in Osage County averages 4.85 m/s; at 50 m it is 6.99 m/s. That gives a shear exponent of 0.227, typical of ordinary open country. Going from 20 m to 50 m takes output from 17,326 to 26,971 kWh a year, 56% more, before counting the extra cost of the taller tower. Why tower height decides it explains the shear behind these numbers.

Hub heightAverage windOutputPayback
20 m5.68 m/s17,326 kWh38 years
30 m6.22 m/s21,370 kWh31 years
40 m6.64 m/s24,470 kWh27 years
50 m6.99 m/s26,971 kWh24 years

Counties around Osage County

2 of the 6 closest counties are windier at turbine height; the windiest, Lyon County, averages 6.38 m/s.

Sun versus wind in Osage County

Osage County gets 4.37 kWh of sunshine per square metre a day on average. One kW of solar panels here would make roughly 1,276 kWh a year; one kW of the turbine above makes 2,134. This is one of the rare places where a kilowatt of turbine out-produces a kilowatt of panels, by 1.7 times. Panel output assumes an 80% system performance ratio. Wind or solar runs the same comparison for every county.

How this is worked out

Wind is NASA's Power climate record, the 2001-2025 average at 10 m and 50 m for the county's centre, carried to 30 m with this county's own measured wind shear and spread into hours with a Rayleigh distribution. The turbine is a generic 10 kW, 7 m rotor machine with 10% losses. Cost is $10,000 per kW installed with no tax credit, because the federal one ended in 2025. One county-centre number cannot see your hilltop or your tree line, so treat it as the starting point for a site survey, not a substitute. The full method and its weak spots are in how the numbers are made.