TurbinePayback

Wind Turbine Payback in Osceola County, MI

Wind turbine payback in Osceola County

No. The turbine wears out before it pays for itself.

At 30 m, the height a home turbine tower usually reaches, the wind in Osceola County, MI averages 5.54 m/s (12.4 mph). A 10 kW turbine there would make about 16,326 kWh a year, worth $3,548 at MI's 21.73¢/kWh. Against an installed cost of about $100,000, that is a payback of 28 years, and the turbine is built to last about 20.

What to do in Osceola County

A home turbine is not worth buying for savings in Osceola County unless your spot is far windier than the county average, 6.4 m/s at the hub against 5.54 m/s here. Per kW, solar panels would make about 1,086 kWh a year here against the turbine's 1,633, so get a solar quote first.

What would have to change

Against the rest of MI

Osceola County is the 1,186th windiest of 3,144 US counties at turbine height; the national middle is 4.79 m/s. The windiest in MI is Keweenaw County at 7.4 m/s, payback 15 years.

Month by month in Osceola County

January is the strongest month here, at 6.29 m/s and about 1,855 kWh. July is the weakest, 4.37 m/s and 730 kWh, so the best month makes 2.5 times the worst. November to March brings in 52% of the year's output in Osceola County.

MonthWind at 30 mOutputWorth
January6.29 m/s1,855 kWh$403
February6.43 m/s1,756 kWh$382
March6.01 m/s1,678 kWh$365
April6.13 m/s1,699 kWh$369
May5.38 m/s1,291 kWh$281
June4.72 m/s878 kWh$191
July4.37 m/s730 kWh$159
August4.51 m/s796 kWh$173
September4.98 m/s1,019 kWh$221
October5.72 m/s1,497 kWh$325
November5.96 m/s1,597 kWh$347
December6.09 m/s1,728 kWh$375

What a taller tower would buy

Measured at 10 m the wind in Osceola County averages 4.19 m/s; at 50 m it is 6.31 m/s. That gives a shear exponent of 0.254, typical of ordinary open country. Going from 20 m to 50 m takes output from 12,533 to 22,003 kWh a year, 76% more, before counting the extra cost of the taller tower. Why tower height decides it explains the shear behind these numbers.

Hub heightAverage windOutputPayback
20 m5 m/s12,533 kWh37 years
30 m5.54 m/s16,342 kWh28 years
40 m5.96 m/s19,425 kWh24 years
50 m6.31 m/s22,003 kWh21 years

Counties around Osceola County

3 of the 6 closest counties are windier at turbine height; the windiest, Wexford County, averages 6.23 m/s.

Sun versus wind in Osceola County

Osceola County gets 3.72 kWh of sunshine per square metre a day on average. One kW of solar panels here would make roughly 1,086 kWh a year; one kW of the turbine above makes 1,633. This is one of the rare places where a kilowatt of turbine out-produces a kilowatt of panels, by 1.5 times. Panel output assumes an 80% system performance ratio. Wind or solar runs the same comparison for every county.

How this is worked out

Wind is NASA's Power climate record, the 2001-2025 average at 10 m and 50 m for the county's centre, carried to 30 m with this county's own measured wind shear and spread into hours with a Rayleigh distribution. The turbine is a generic 10 kW, 7 m rotor machine with 10% losses. Cost is $10,000 per kW installed with no tax credit, because the federal one ended in 2025. One county-centre number cannot see your hilltop or your tree line, so treat it as the starting point for a site survey, not a substitute. The full method and its weak spots are in how the numbers are made.