Wind turbine payback in Pender County

No. The turbine wears out before it pays for itself.

At 30 m, the height a home turbine tower usually reaches, the wind in Pender County, NC averages 3.6 m/s (8.1 mph). A 10 kW turbine there would make about 4,736 kWh a year, worth $708 at NC's 14.94¢/kWh. Against an installed cost of about $100,000, that is a payback of over 100 years, and the turbine is built to last about 20.

What to do in Pender County

A home turbine is not worth buying for savings in Pender County unless your spot is far windier than the county average, 7.9 m/s at the hub against 3.6 m/s here. Per kW, solar panels would make about 1,343 kWh a year here against the turbine's 474, so get a solar quote first.

What would have to change

Against the rest of NC

Pender County is the 2,402nd windiest of 3,144 US counties at turbine height; the national middle is 4.79 m/s. The windiest in NC is Dare County at 6.91 m/s, payback 25 years.

Month by month in Pender County

April is the strongest month here, at 4.13 m/s and about 594 kWh. August is the weakest, 2.96 m/s and 212 kWh, so the best month makes 2.8 times the worst. November to March brings in 49% of the year's output in Pender County.

MonthWind at 30 mOutputWorth
January3.79 m/s474 kWh$71
February3.98 m/s495 kWh$74
March4.04 m/s575 kWh$86
April4.13 m/s594 kWh$89
May3.67 m/s428 kWh$64
June3.22 m/s271 kWh$40
July3.15 m/s260 kWh$39
August2.96 m/s212 kWh$32
September3.44 m/s337 kWh$50
October3.55 m/s386 kWh$58
November3.68 m/s418 kWh$62
December3.68 m/s431 kWh$64

What a taller tower would buy

Measured at 10 m the wind in Pender County averages 2.21 m/s; at 50 m it is 4.52 m/s. That gives a shear exponent of 0.445, typical of rough, sheltered ground: trees or buildings slow the low wind a lot. Going from 20 m to 50 m takes output from 2,620 to 9,459 kWh a year, 261% more, before counting the extra cost of the taller tower. Why tower height decides it explains the shear behind these numbers.

Hub heightAverage windOutputPayback
20 m3.01 m/s2,620 kWhover 100 years
30 m3.6 m/s4,740 kWhover 100 years
40 m4.09 m/s7,052 kWh95 years
50 m4.52 m/s9,459 kWh71 years

Counties around Pender County

6 of the 6 closest counties are windier at turbine height; the windiest, Duplin County, averages 4.9 m/s.

Sun versus wind in Pender County

Pender County gets 4.6 kWh of sunshine per square metre a day on average. One kW of solar panels here would make roughly 1,343 kWh a year; one kW of the turbine above makes 474. Kilowatt for kilowatt, panels make 2.8 times as much here as the turbine. Panel output assumes an 80% system performance ratio. Wind or solar runs the same comparison for every county.

How this is worked out

Wind is NASA's Power climate record, the 2001-2025 average at 10 m and 50 m for the county's centre, carried to 30 m with this county's own measured wind shear and spread into hours with a Rayleigh distribution. The turbine is a generic 10 kW, 7 m rotor machine with 10% losses. Cost is $10,000 per kW installed with no tax credit, because the federal one ended in 2025. One county-centre number cannot see your hilltop or your tree line, so treat it as the starting point for a site survey, not a substitute. The full method and its weak spots are in how the numbers are made.