TurbinePayback

Wind Turbine Payback in Pike County, AR

Wind turbine payback in Pike County

No. The turbine wears out before it pays for itself.

At 30 m, the height a home turbine tower usually reaches, the wind in Pike County, AR averages 3.28 m/s (7.3 mph). A 10 kW turbine there would make about 3,506 kWh a year, worth $482 at AR's 13.74¢/kWh. Against an installed cost of about $100,000, that is a payback of over 100 years, and the turbine is built to last about 20.

What to do in Pike County

A home turbine is not worth buying for savings in Pike County unless your spot is far windier than the county average, 8.4 m/s at the hub against 3.28 m/s here. Per kW, solar panels would make about 1,285 kWh a year here against the turbine's 351, so get a solar quote first.

What would have to change

Against the rest of AR

Pike County is the 2,773rd windiest of 3,144 US counties at turbine height; the national middle is 4.79 m/s. The windiest in AR is Mississippi County at 5.35 m/s, payback 49 years.

Month by month in Pike County

April is the strongest month here, at 3.78 m/s and about 455 kWh. August is the weakest, 2.67 m/s and 146 kWh, so the best month makes 3.1 times the worst. November to March brings in 50% of the year's output in Pike County.

MonthWind at 30 mOutputWorth
January3.44 m/s349 kWh$48
February3.55 m/s346 kWh$48
March3.72 m/s446 kWh$61
April3.78 m/s455 kWh$63
May3.37 m/s326 kWh$45
June2.95 m/s202 kWh$28
July2.67 m/s148 kWh$20
August2.67 m/s146 kWh$20
September3.02 m/s217 kWh$30
October3.28 m/s299 kWh$41
November3.49 m/s353 kWh$49
December3.37 m/s326 kWh$45

What a taller tower would buy

Measured at 10 m the wind in Pike County averages 1.98 m/s; at 50 m it is 4.14 m/s. That gives a shear exponent of 0.458, typical of rough, sheltered ground: trees or buildings slow the low wind a lot. Going from 20 m to 50 m takes output from 1,848 to 7,301 kWh a year, 295% more, before counting the extra cost of the taller tower. Why tower height decides it explains the shear behind these numbers.

Hub heightAverage windOutputPayback
20 m2.72 m/s1,848 kWhover 100 years
30 m3.28 m/s3,493 kWhover 100 years
40 m3.74 m/s5,332 kWhover 100 years
50 m4.14 m/s7,301 kWh100 years

Counties around Pike County

3 of the 6 closest counties are windier at turbine height; the windiest, Hempstead County, averages 3.55 m/s.

Sun versus wind in Pike County

Pike County gets 4.4 kWh of sunshine per square metre a day on average. One kW of solar panels here would make roughly 1,285 kWh a year; one kW of the turbine above makes 351. Kilowatt for kilowatt, panels make 3.7 times as much here as the turbine. Panel output assumes an 80% system performance ratio. Wind or solar runs the same comparison for every county.

How this is worked out

Wind is NASA's Power climate record, the 2001-2025 average at 10 m and 50 m for the county's centre, carried to 30 m with this county's own measured wind shear and spread into hours with a Rayleigh distribution. The turbine is a generic 10 kW, 7 m rotor machine with 10% losses. Cost is $10,000 per kW installed with no tax credit, because the federal one ended in 2025. One county-centre number cannot see your hilltop or your tree line, so treat it as the starting point for a site survey, not a substitute. The full method and its weak spots are in how the numbers are made.