TurbinePayback

Wind Turbine Payback in Pike County, OH

Wind turbine payback in Pike County

No. The turbine wears out before it pays for itself.

At 30 m, the height a home turbine tower usually reaches, the wind in Pike County, OH averages 3.73 m/s (8.3 mph). A 10 kW turbine there would make about 5,297 kWh a year, worth $996 at OH's 18.81¢/kWh. Against an installed cost of about $100,000, that is a payback of over 100 years, and the turbine is built to last about 20.

What to do in Pike County

A home turbine is not worth buying for savings in Pike County unless your spot is far windier than the county average, 6.9 m/s at the hub against 3.73 m/s here. Per kW, solar panels would make about 1,165 kWh a year here against the turbine's 530, so get a solar quote first.

What would have to change

Against the rest of OH

Pike County is the 2,261st windiest of 3,144 US counties at turbine height; the national middle is 4.79 m/s. The windiest in OH is Lake County at 6.53 m/s, payback 23 years.

Month by month in Pike County

January is the strongest month here, at 4.43 m/s and about 759 kWh. August is the weakest, 2.80 m/s and 175 kWh, so the best month makes 4.3 times the worst. November to March brings in 59% of the year's output in Pike County.

MonthWind at 30 mOutputWorth
January4.43 m/s759 kWh$143
February4.46 m/s696 kWh$131
March4.37 m/s731 kWh$138
April4.34 m/s692 kWh$130
May3.54 m/s381 kWh$72
June3.16 m/s256 kWh$48
July2.82 m/s178 kWh$33
August2.80 m/s175 kWh$33
September3.09 m/s237 kWh$45
October3.66 m/s425 kWh$80
November3.96 m/s523 kWh$98
December4.11 m/s608 kWh$114

What a taller tower would buy

Measured at 10 m the wind in Pike County averages 2.42 m/s; at 50 m it is 4.56 m/s. That gives a shear exponent of 0.394, typical of rough, sheltered ground: trees or buildings slow the low wind a lot. Going from 20 m to 50 m takes output from 3,159 to 9,702 kWh a year, 207% more, before counting the extra cost of the taller tower. Why tower height decides it explains the shear behind these numbers.

Hub heightAverage windOutputPayback
20 m3.18 m/s3,159 kWhover 100 years
30 m3.73 m/s5,291 kWhover 100 years
40 m4.18 m/s7,495 kWh71 years
50 m4.56 m/s9,702 kWh55 years

Counties around Pike County

4 of the 6 closest counties are windier at turbine height; the windiest, Ross County, averages 4.88 m/s.

Sun versus wind in Pike County

Pike County gets 3.99 kWh of sunshine per square metre a day on average. One kW of solar panels here would make roughly 1,165 kWh a year; one kW of the turbine above makes 530. Kilowatt for kilowatt, panels make 2.2 times as much here as the turbine. Panel output assumes an 80% system performance ratio. Wind or solar runs the same comparison for every county.

How this is worked out

Wind is NASA's Power climate record, the 2001-2025 average at 10 m and 50 m for the county's centre, carried to 30 m with this county's own measured wind shear and spread into hours with a Rayleigh distribution. The turbine is a generic 10 kW, 7 m rotor machine with 10% losses. Cost is $10,000 per kW installed with no tax credit, because the federal one ended in 2025. One county-centre number cannot see your hilltop or your tree line, so treat it as the starting point for a site survey, not a substitute. The full method and its weak spots are in how the numbers are made.