Wind turbine payback in Prairie County

No. The turbine wears out before it pays for itself.

At 30 m, the height a home turbine tower usually reaches, the wind in Prairie County, AR averages 5.12 m/s (11.5 mph). A 10 kW turbine there would make about 13,353 kWh a year, worth $1,835 at AR's 13.74¢/kWh. Against an installed cost of about $100,000, that is a payback of 55 years, and the turbine is built to last about 20.

What to do in Prairie County

A home turbine is not worth buying for savings in Prairie County unless your spot is far windier than the county average, 8.4 m/s at the hub against 5.12 m/s here. Per kW, solar panels would make about 1,323 kWh a year here against the turbine's 1,335, so get a solar quote first.

What would have to change

Against the rest of AR

Prairie County is the 1,403rd windiest of 3,144 US counties at turbine height; the national middle is 4.79 m/s. The windiest in AR is Mississippi County at 5.35 m/s, payback 49 years.

Month by month in Prairie County

March is the strongest month here, at 6.04 m/s and about 1,700 kWh. July is the weakest, 3.74 m/s and 453 kWh, so the best month makes 3.8 times the worst. November to March brings in 55% of the year's output in Prairie County.

MonthWind at 30 mOutputWorth
January5.81 m/s1,557 kWh$214
February5.92 m/s1,466 kWh$201
March6.04 m/s1,700 kWh$234
April6.05 m/s1,650 kWh$227
May5.14 m/s1,146 kWh$157
June4.21 m/s632 kWh$87
July3.74 m/s453 kWh$62
August3.86 m/s501 kWh$69
September4.46 m/s746 kWh$103
October5.08 m/s1,110 kWh$153
November5.63 m/s1,396 kWh$192
December5.64 m/s1,448 kWh$199

What a taller tower would buy

Measured at 10 m the wind in Prairie County averages 3.85 m/s; at 50 m it is 5.85 m/s. That gives a shear exponent of 0.260, typical of ordinary open country. Going from 20 m to 50 m takes output from 10,008 to 18,595 kWh a year, 86% more, before counting the extra cost of the taller tower. Why tower height decides it explains the shear behind these numbers.

Hub heightAverage windOutputPayback
20 m4.61 m/s10,008 kWh73 years
30 m5.12 m/s13,369 kWh54 years
40 m5.52 m/s16,183 kWh45 years
50 m5.85 m/s18,595 kWh39 years

Counties around Prairie County

None of the 6 closest counties is windier than Prairie County.

Sun versus wind in Prairie County

Prairie County gets 4.53 kWh of sunshine per square metre a day on average. One kW of solar panels here would make roughly 1,323 kWh a year; one kW of the turbine above makes 1,335. This is one of the rare places where a kilowatt of turbine out-produces a kilowatt of panels, by 1.0 times. Panel output assumes an 80% system performance ratio. Wind or solar runs the same comparison for every county.

How this is worked out

Wind is NASA's Power climate record, the 2001-2025 average at 10 m and 50 m for the county's centre, carried to 30 m with this county's own measured wind shear and spread into hours with a Rayleigh distribution. The turbine is a generic 10 kW, 7 m rotor machine with 10% losses. Cost is $10,000 per kW installed with no tax credit, because the federal one ended in 2025. One county-centre number cannot see your hilltop or your tree line, so treat it as the starting point for a site survey, not a substitute. The full method and its weak spots are in how the numbers are made.