TurbinePayback

Wind Turbine Payback in Prince Edward County, VA

Wind turbine payback in Prince Edward County

No. The turbine wears out before it pays for itself.

At 30 m, the height a home turbine tower usually reaches, the wind in Prince Edward County, VA averages 3.29 m/s (7.4 mph). A 10 kW turbine there would make about 3,541 kWh a year, worth $600 at VA's 16.95¢/kWh. Against an installed cost of about $100,000, that is a payback of over 100 years, and the turbine is built to last about 20.

What to do in Prince Edward County

A home turbine is not worth buying for savings in Prince Edward County unless your spot is far windier than the county average, 7.3 m/s at the hub against 3.29 m/s here. Per kW, solar panels would make about 1,250 kWh a year here against the turbine's 354, so get a solar quote first.

What would have to change

Against the rest of VA

Prince Edward County is the 2,761st windiest of 3,144 US counties at turbine height; the national middle is 4.79 m/s. The windiest in VA is Northampton County at 7.01 m/s, payback 22 years.

Month by month in Prince Edward County

March is the strongest month here, at 3.81 m/s and about 482 kWh. August is the weakest, 2.60 m/s and 132 kWh, so the best month makes 3.7 times the worst. November to March brings in 54% of the year's output in Prince Edward County.

MonthWind at 30 mOutputWorth
January3.68 m/s431 kWh$73
February3.82 m/s438 kWh$74
March3.81 m/s482 kWh$82
April3.81 m/s466 kWh$79
May3.26 m/s292 kWh$49
June2.90 m/s191 kWh$32
July2.68 m/s148 kWh$25
August2.60 m/s132 kWh$22
September2.91 m/s193 kWh$33
October3.22 m/s280 kWh$47
November3.39 m/s322 kWh$55
December3.45 m/s351 kWh$59

What a taller tower would buy

Measured at 10 m the wind in Prince Edward County averages 1.98 m/s; at 50 m it is 4.17 m/s. That gives a shear exponent of 0.463, typical of rough, sheltered ground: trees or buildings slow the low wind a lot. Going from 20 m to 50 m takes output from 1,866 to 7,461 kWh a year, 300% more, before counting the extra cost of the taller tower. Why tower height decides it explains the shear behind these numbers.

Hub heightAverage windOutputPayback
20 m2.73 m/s1,866 kWhover 100 years
30 m3.29 m/s3,547 kWhover 100 years
40 m3.76 m/s5,435 kWhover 100 years
50 m4.17 m/s7,461 kWh79 years

Counties around Prince Edward County

1 of the 6 closest counties is windier at turbine height; the windiest, Charlotte County, averages 3.32 m/s.

Sun versus wind in Prince Edward County

Prince Edward County gets 4.28 kWh of sunshine per square metre a day on average. One kW of solar panels here would make roughly 1,250 kWh a year; one kW of the turbine above makes 354. Kilowatt for kilowatt, panels make 3.5 times as much here as the turbine. Panel output assumes an 80% system performance ratio. Wind or solar runs the same comparison for every county.

How this is worked out

Wind is NASA's Power climate record, the 2001-2025 average at 10 m and 50 m for the county's centre, carried to 30 m with this county's own measured wind shear and spread into hours with a Rayleigh distribution. The turbine is a generic 10 kW, 7 m rotor machine with 10% losses. Cost is $10,000 per kW installed with no tax credit, because the federal one ended in 2025. One county-centre number cannot see your hilltop or your tree line, so treat it as the starting point for a site survey, not a substitute. The full method and its weak spots are in how the numbers are made.