TurbinePayback

Wind Turbine Payback in Randolph County, GA

Wind turbine payback in Randolph County

No. The turbine wears out before it pays for itself.

At 30 m, the height a home turbine tower usually reaches, the wind in Randolph County, GA averages 3.3 m/s (7.4 mph). A 10 kW turbine there would make about 3,577 kWh a year, worth $554 at GA's 15.48¢/kWh. Against an installed cost of about $100,000, that is a payback of over 100 years, and the turbine is built to last about 20.

What to do in Randolph County

A home turbine is not worth buying for savings in Randolph County unless your spot is far windier than the county average, 7.8 m/s at the hub against 3.3 m/s here. Per kW, solar panels would make about 1,396 kWh a year here against the turbine's 358, so get a solar quote first.

What would have to change

Against the rest of GA

Randolph County is the 2,741st windiest of 3,144 US counties at turbine height; the national middle is 4.79 m/s. The windiest in GA is Glynn County at 5.08 m/s, payback 49 years.

Month by month in Randolph County

March is the strongest month here, at 3.77 m/s and about 463 kWh. July is the weakest, 2.62 m/s and 137 kWh, so the best month makes 3.4 times the worst. November to March brings in 54% of the year's output in Randolph County.

MonthWind at 30 mOutputWorth
January3.67 m/s427 kWh$66
February3.71 m/s399 kWh$62
March3.77 m/s463 kWh$72
April3.67 m/s413 kWh$64
May3.20 m/s274 kWh$42
June2.76 m/s161 kWh$25
July2.62 m/s137 kWh$21
August2.65 m/s143 kWh$22
September3.17 m/s258 kWh$40
October3.37 m/s326 kWh$50
November3.54 m/s369 kWh$57
December3.55 m/s384 kWh$59

What a taller tower would buy

Measured at 10 m the wind in Randolph County averages 2.05 m/s; at 50 m it is 4.12 m/s. That gives a shear exponent of 0.434, typical of rough, sheltered ground: trees or buildings slow the low wind a lot. Going from 20 m to 50 m takes output from 1,965 to 7,195 kWh a year, 266% more, before counting the extra cost of the taller tower. Why tower height decides it explains the shear behind these numbers.

Hub heightAverage windOutputPayback
20 m2.77 m/s1,965 kWhover 100 years
30 m3.3 m/s3,579 kWhover 100 years
40 m3.74 m/s5,341 kWhover 100 years
50 m4.12 m/s7,195 kWh90 years

Counties around Randolph County

4 of the 6 closest counties are windier at turbine height; the windiest, Calhoun County, averages 4.66 m/s.

Sun versus wind in Randolph County

Randolph County gets 4.78 kWh of sunshine per square metre a day on average. One kW of solar panels here would make roughly 1,396 kWh a year; one kW of the turbine above makes 358. Kilowatt for kilowatt, panels make 3.9 times as much here as the turbine. Panel output assumes an 80% system performance ratio. Wind or solar runs the same comparison for every county.

How this is worked out

Wind is NASA's Power climate record, the 2001-2025 average at 10 m and 50 m for the county's centre, carried to 30 m with this county's own measured wind shear and spread into hours with a Rayleigh distribution. The turbine is a generic 10 kW, 7 m rotor machine with 10% losses. Cost is $10,000 per kW installed with no tax credit, because the federal one ended in 2025. One county-centre number cannot see your hilltop or your tree line, so treat it as the starting point for a site survey, not a substitute. The full method and its weak spots are in how the numbers are made.