TurbinePayback

Wind Turbine Payback in Roane County, TN

Wind turbine payback in Roane County

No. The turbine wears out before it pays for itself.

At 30 m, the height a home turbine tower usually reaches, the wind in Roane County, TN averages 3.05 m/s (6.8 mph). A 10 kW turbine there would make about 2,751 kWh a year, worth $380 at TN's 13.8¢/kWh. Against an installed cost of about $100,000, that is a payback of over 100 years, and the turbine is built to last about 20.

What to do in Roane County

A home turbine is not worth buying for savings in Roane County unless your spot is far windier than the county average, 8.4 m/s at the hub against 3.05 m/s here. Per kW, solar panels would make about 1,261 kWh a year here against the turbine's 275, so get a solar quote first.

What would have to change

Against the rest of TN

Roane County is the 3,024th windiest of 3,144 US counties at turbine height; the national middle is 4.79 m/s. The windiest in TN is Lake County at 5.54 m/s, payback 44 years.

Month by month in Roane County

March is the strongest month here, at 3.63 m/s and about 414 kWh. August is the weakest, 2.33 m/s and 87 kWh, so the best month makes 4.8 times the worst. November to March brings in 58% of the year's output in Roane County.

MonthWind at 30 mOutputWorth
January3.48 m/s361 kWh$50
February3.62 m/s371 kWh$51
March3.63 m/s414 kWh$57
April3.62 m/s398 kWh$55
May2.99 m/s219 kWh$30
June2.57 m/s123 kWh$17
July2.35 m/s91 kWh$13
August2.33 m/s87 kWh$12
September2.56 m/s122 kWh$17
October2.97 m/s213 kWh$29
November3.20 m/s266 kWh$37
December3.30 m/s303 kWh$42

What a taller tower would buy

Measured at 10 m the wind in Roane County averages 1.88 m/s; at 50 m it is 3.82 m/s. That gives a shear exponent of 0.441, typical of rough, sheltered ground: trees or buildings slow the low wind a lot. Going from 20 m to 50 m takes output from 1,456 to 5,707 kWh a year, 292% more, before counting the extra cost of the taller tower. Why tower height decides it explains the shear behind these numbers.

Hub heightAverage windOutputPayback
20 m2.55 m/s1,456 kWhover 100 years
30 m3.05 m/s2,750 kWhover 100 years
40 m3.46 m/s4,179 kWhover 100 years
50 m3.82 m/s5,707 kWhover 100 years

Counties around Roane County

4 of the 6 closest counties are windier at turbine height; the windiest, Cumberland County, averages 3.18 m/s.

Sun versus wind in Roane County

Roane County gets 4.32 kWh of sunshine per square metre a day on average. One kW of solar panels here would make roughly 1,261 kWh a year; one kW of the turbine above makes 275. Kilowatt for kilowatt, panels make 4.6 times as much here as the turbine. Panel output assumes an 80% system performance ratio. Wind or solar runs the same comparison for every county.

How this is worked out

Wind is NASA's Power climate record, the 2001-2025 average at 10 m and 50 m for the county's centre, carried to 30 m with this county's own measured wind shear and spread into hours with a Rayleigh distribution. The turbine is a generic 10 kW, 7 m rotor machine with 10% losses. Cost is $10,000 per kW installed with no tax credit, because the federal one ended in 2025. One county-centre number cannot see your hilltop or your tree line, so treat it as the starting point for a site survey, not a substitute. The full method and its weak spots are in how the numbers are made.