Wind turbine payback in Rockingham County

No. The turbine wears out before it pays for itself.

At 30 m, the height a home turbine tower usually reaches, the wind in Rockingham County, NC averages 3.73 m/s (8.3 mph). A 10 kW turbine there would make about 5,297 kWh a year, worth $791 at NC's 14.94¢/kWh. Against an installed cost of about $100,000, that is a payback of over 100 years, and the turbine is built to last about 20.

What to do in Rockingham County

A home turbine is not worth buying for savings in Rockingham County unless your spot is far windier than the county average, 7.9 m/s at the hub against 3.73 m/s here. Per kW, solar panels would make about 1,267 kWh a year here against the turbine's 530, so get a solar quote first.

What would have to change

Against the rest of NC

Rockingham County is the 2,261st windiest of 3,144 US counties at turbine height; the national middle is 4.79 m/s. The windiest in NC is Dare County at 6.91 m/s, payback 25 years.

Month by month in Rockingham County

March is the strongest month here, at 4.43 m/s and about 760 kWh. August is the weakest, 2.81 m/s and 175 kWh, so the best month makes 4.3 times the worst. November to March brings in 56% of the year's output in Rockingham County.

MonthWind at 30 mOutputWorth
January4.29 m/s687 kWh$103
February4.43 m/s683 kWh$102
March4.43 m/s760 kWh$114
April4.42 m/s727 kWh$109
May3.66 m/s423 kWh$63
June3.17 m/s258 kWh$39
July2.90 m/s196 kWh$29
August2.81 m/s175 kWh$26
September3.24 m/s278 kWh$42
October3.67 m/s426 kWh$64
November3.90 m/s499 kWh$75
December3.99 m/s554 kWh$83

What a taller tower would buy

Measured at 10 m the wind in Rockingham County averages 2.47 m/s; at 50 m it is 4.52 m/s. That gives a shear exponent of 0.375, typical of rough, sheltered ground: trees or buildings slow the low wind a lot. Going from 20 m to 50 m takes output from 3,250 to 9,459 kWh a year, 191% more, before counting the extra cost of the taller tower. Why tower height decides it explains the shear behind these numbers.

Hub heightAverage windOutputPayback
20 m3.21 m/s3,250 kWhover 100 years
30 m3.73 m/s5,306 kWhover 100 years
40 m4.16 m/s7,392 kWh91 years
50 m4.52 m/s9,459 kWh71 years

Counties around Rockingham County

3 of the 6 closest counties are windier at turbine height; the windiest, Guilford County, averages 4.47 m/s.

Sun versus wind in Rockingham County

Rockingham County gets 4.34 kWh of sunshine per square metre a day on average. One kW of solar panels here would make roughly 1,267 kWh a year; one kW of the turbine above makes 530. Kilowatt for kilowatt, panels make 2.4 times as much here as the turbine. Panel output assumes an 80% system performance ratio. Wind or solar runs the same comparison for every county.

How this is worked out

Wind is NASA's Power climate record, the 2001-2025 average at 10 m and 50 m for the county's centre, carried to 30 m with this county's own measured wind shear and spread into hours with a Rayleigh distribution. The turbine is a generic 10 kW, 7 m rotor machine with 10% losses. Cost is $10,000 per kW installed with no tax credit, because the federal one ended in 2025. One county-centre number cannot see your hilltop or your tree line, so treat it as the starting point for a site survey, not a substitute. The full method and its weak spots are in how the numbers are made.