TurbinePayback

Wind Turbine Payback in Saline County, NE

Wind turbine payback in Saline County

No. The turbine wears out before it pays for itself.

At 30 m, the height a home turbine tower usually reaches, the wind in Saline County, NE averages 6.42 m/s (14.4 mph). A 10 kW turbine there would make about 22,817 kWh a year, worth $2,948 at NE's 12.92¢/kWh. Against an installed cost of about $100,000, that is a payback of 34 years, and the turbine is built to last about 20.

What to do in Saline County

A home turbine is not worth buying for savings in Saline County unless your spot is far windier than the county average, 8.8 m/s at the hub against 6.42 m/s here. Per kW, solar panels would make about 1,285 kWh a year here against the turbine's 2,282, so get a solar quote first.

What would have to change

Against the rest of NE

Saline County is the 301st windiest of 3,144 US counties at turbine height; the national middle is 4.79 m/s. The windiest in NE is Cherry County at 6.83 m/s, payback 30 years.

Month by month in Saline County

April is the strongest month here, at 7.31 m/s and about 2,401 kWh. August is the weakest, 5.23 m/s and 1,196 kWh, so the best month makes 2.0 times the worst. November to March brings in 45% of the year's output in Saline County.

MonthWind at 30 mOutputWorth
January6.62 m/s2,062 kWh$266
February6.62 m/s1,863 kWh$241
March6.97 m/s2,277 kWh$294
April7.31 m/s2,401 kWh$310
May6.61 m/s2,057 kWh$266
June6.21 m/s1,746 kWh$226
July5.32 m/s1,255 kWh$162
August5.23 m/s1,196 kWh$155
September6.28 m/s1,790 kWh$231
October6.68 m/s2,101 kWh$271
November6.81 m/s2,108 kWh$272
December6.48 m/s1,979 kWh$256

What a taller tower would buy

Measured at 10 m the wind in Saline County averages 5.04 m/s; at 50 m it is 7.19 m/s. That gives a shear exponent of 0.221, typical of ordinary open country. Going from 20 m to 50 m takes output from 18,757 to 28,390 kWh a year, 51% more, before counting the extra cost of the taller tower. Why tower height decides it explains the shear behind these numbers.

Hub heightAverage windOutputPayback
20 m5.87 m/s18,757 kWh41 years
30 m6.42 m/s22,835 kWh34 years
40 m6.84 m/s25,921 kWh30 years
50 m7.19 m/s28,390 kWh27 years

Counties around Saline County

1 of the 6 closest counties is windier at turbine height; the windiest, Fillmore County, averages 6.51 m/s.

Sun versus wind in Saline County

Saline County gets 4.4 kWh of sunshine per square metre a day on average. One kW of solar panels here would make roughly 1,285 kWh a year; one kW of the turbine above makes 2,282. This is one of the rare places where a kilowatt of turbine out-produces a kilowatt of panels, by 1.8 times. Panel output assumes an 80% system performance ratio. Wind or solar runs the same comparison for every county.

How this is worked out

Wind is NASA's Power climate record, the 2001-2025 average at 10 m and 50 m for the county's centre, carried to 30 m with this county's own measured wind shear and spread into hours with a Rayleigh distribution. The turbine is a generic 10 kW, 7 m rotor machine with 10% losses. Cost is $10,000 per kW installed with no tax credit, because the federal one ended in 2025. One county-centre number cannot see your hilltop or your tree line, so treat it as the starting point for a site survey, not a substitute. The full method and its weak spots are in how the numbers are made.