Wind Turbine Payback in Scott County, IA

Wind turbine payback in Scott County

No. The turbine wears out before it pays for itself.

At 30 m, the height a home turbine tower usually reaches, the wind in Scott County, IA averages 5.99 m/s (13.4 mph). A 10 kW turbine there would make about 19,630 kWh a year, worth $2,856 at IA's 14.55¢/kWh. Against an installed cost of about $100,000, that is a payback of 35 years, and the turbine is built to last about 20.

What to do in Scott County

A home turbine is not worth buying for savings in Scott County unless your spot is far windier than the county average, 8.1 m/s at the hub against 5.99 m/s here. Per kW, solar panels would make about 1,165 kWh a year here against the turbine's 1,963, so get a solar quote first.

What would have to change

Against the rest of IA

Scott County is the 858th windiest of 3,144 US counties at turbine height; the national middle is 4.79 m/s. The windiest in IA is Dickinson County at 6.59 m/s, payback 29 years.

Month by month in Scott County

April is the strongest month here, at 6.96 m/s and about 2,201 kWh. August is the weakest, 4.68 m/s and 885 kWh, so the best month makes 2.5 times the worst. November to March brings in 49% of the year's output in Scott County.

MonthWind at 30 mOutputWorth
January6.45 m/s1,955 kWh$284
February6.45 m/s1,766 kWh$257
March6.63 m/s2,066 kWh$301
April6.96 m/s2,201 kWh$320
May6.13 m/s1,753 kWh$255
June5.39 m/s1,252 kWh$182
July4.69 m/s894 kWh$130
August4.68 m/s885 kWh$129
September5.49 m/s1,315 kWh$191
October6.29 m/s1,854 kWh$270
November6.56 m/s1,962 kWh$285
December6.26 m/s1,837 kWh$267

What a taller tower would buy

Measured at 10 m the wind in Scott County averages 4.67 m/s; at 50 m it is 6.73 m/s. That gives a shear exponent of 0.227, typical of ordinary open country. Going from 20 m to 50 m takes output from 15,793 to 25,093 kWh a year, 59% more, before counting the extra cost of the taller tower. Why tower height decides it explains the shear behind these numbers.

Hub heightAverage windOutputPayback
20 m5.47 m/s15,793 kWh44 years
30 m5.99 m/s19,653 kWh35 years
40 m6.4 m/s22,651 kWh30 years
50 m6.73 m/s25,093 kWh27 years

Counties around Scott County

2 of the 6 closest counties are windier at turbine height; the windiest, Mercer County, averages 6.02 m/s.

Sun versus wind in Scott County

Scott County gets 3.99 kWh of sunshine per square metre a day on average. One kW of solar panels here would make roughly 1,165 kWh a year; one kW of the turbine above makes 1,963. This is one of the rare places where a kilowatt of turbine out-produces a kilowatt of panels, by 1.7 times. Panel output assumes an 80% system performance ratio. Wind or solar runs the same comparison for every county.

How this is worked out

Wind is NASA's Power climate record, the 2001-2025 average at 10 m and 50 m for the county's centre, carried to 30 m with this county's own measured wind shear and spread into hours with a Rayleigh distribution. The turbine is a generic 10 kW, 7 m rotor machine with 10% losses. Cost is $10,000 per kW installed with no tax credit, because the federal one ended in 2025. One county-centre number cannot see your hilltop or your tree line, so treat it as the starting point for a site survey, not a substitute. The full method and its weak spots are in how the numbers are made.