TurbinePayback

Wind Turbine Payback in Shelby County, IA

Wind turbine payback in Shelby County

No. The turbine wears out before it pays for itself.

At 30 m, the height a home turbine tower usually reaches, the wind in Shelby County, IA averages 6.35 m/s (14.2 mph). A 10 kW turbine there would make about 22,299 kWh a year, worth $3,245 at IA's 14.55¢/kWh. Against an installed cost of about $100,000, that is a payback of 31 years, and the turbine is built to last about 20.

What to do in Shelby County

A home turbine is not worth buying for savings in Shelby County unless your spot is far windier than the county average, 8.1 m/s at the hub against 6.35 m/s here. Per kW, solar panels would make about 1,215 kWh a year here against the turbine's 2,230, so get a solar quote first.

What would have to change

Against the rest of IA

Shelby County is the 402nd windiest of 3,144 US counties at turbine height; the national middle is 4.79 m/s. The windiest in IA is Dickinson County at 6.59 m/s, payback 29 years.

Month by month in Shelby County

April is the strongest month here, at 7.23 m/s and about 2,359 kWh. July is the weakest, 5.09 m/s and 1,115 kWh, so the best month makes 2.1 times the worst. November to March brings in 47% of the year's output in Shelby County.

MonthWind at 30 mOutputWorth
January6.70 m/s2,111 kWh$307
February6.70 m/s1,907 kWh$277
March6.91 m/s2,243 kWh$326
April7.23 m/s2,359 kWh$343
May6.53 m/s2,005 kWh$292
June5.85 m/s1,527 kWh$222
July5.09 m/s1,115 kWh$162
August5.11 m/s1,126 kWh$164
September6.12 m/s1,696 kWh$247
October6.62 m/s2,061 kWh$300
November6.80 m/s2,107 kWh$307
December6.57 m/s2,033 kWh$296

What a taller tower would buy

Measured at 10 m the wind in Shelby County averages 4.99 m/s; at 50 m it is 7.1 m/s. That gives a shear exponent of 0.219, typical of ordinary open country. Going from 20 m to 50 m takes output from 18,293 to 27,755 kWh a year, 52% more, before counting the extra cost of the taller tower. Why tower height decides it explains the shear behind these numbers.

Hub heightAverage windOutputPayback
20 m5.81 m/s18,293 kWh38 years
30 m6.35 m/s22,288 kWh31 years
40 m6.76 m/s25,321 kWh27 years
50 m7.1 m/s27,755 kWh25 years

Counties around Shelby County

2 of the 6 closest counties are windier at turbine height; the windiest, Carroll County, averages 6.42 m/s.

Sun versus wind in Shelby County

Shelby County gets 4.16 kWh of sunshine per square metre a day on average. One kW of solar panels here would make roughly 1,215 kWh a year; one kW of the turbine above makes 2,230. This is one of the rare places where a kilowatt of turbine out-produces a kilowatt of panels, by 1.8 times. Panel output assumes an 80% system performance ratio. Wind or solar runs the same comparison for every county.

How this is worked out

Wind is NASA's Power climate record, the 2001-2025 average at 10 m and 50 m for the county's centre, carried to 30 m with this county's own measured wind shear and spread into hours with a Rayleigh distribution. The turbine is a generic 10 kW, 7 m rotor machine with 10% losses. Cost is $10,000 per kW installed with no tax credit, because the federal one ended in 2025. One county-centre number cannot see your hilltop or your tree line, so treat it as the starting point for a site survey, not a substitute. The full method and its weak spots are in how the numbers are made.