Wind Turbine Payback in Shelby County, IN

Wind turbine payback in Shelby County

No. The turbine wears out before it pays for itself.

At 30 m, the height a home turbine tower usually reaches, the wind in Shelby County, IN averages 5.58 m/s (12.5 mph). A 10 kW turbine there would make about 16,616 kWh a year, worth $2,831 at IN's 17.04¢/kWh. Against an installed cost of about $100,000, that is a payback of 35 years, and the turbine is built to last about 20.

What to do in Shelby County

A home turbine is not worth buying for savings in Shelby County unless your spot is far windier than the county average, 7.3 m/s at the hub against 5.58 m/s here. Per kW, solar panels would make about 1,165 kWh a year here against the turbine's 1,662, so get a solar quote first.

What would have to change

Against the rest of IN

Shelby County is the 1,176th windiest of 3,144 US counties at turbine height; the national middle is 4.79 m/s. The windiest in IN is Lake County at 6.17 m/s, payback 28 years.

Month by month in Shelby County

January is the strongest month here, at 6.44 m/s and about 1,953 kWh. July is the weakest, 4.14 m/s and 620 kWh, so the best month makes 3.1 times the worst. November to March brings in 54% of the year's output in Shelby County.

MonthWind at 30 mOutputWorth
January6.44 m/s1,953 kWh$333
February6.37 m/s1,719 kWh$293
March6.36 m/s1,898 kWh$323
April6.54 m/s1,949 kWh$332
May5.48 m/s1,351 kWh$230
June4.78 m/s909 kWh$155
July4.14 m/s620 kWh$106
August4.15 m/s624 kWh$106
September4.74 m/s890 kWh$152
October5.73 m/s1,504 kWh$256
November6.14 m/s1,708 kWh$291
December6.16 m/s1,776 kWh$303

What a taller tower would buy

Measured at 10 m the wind in Shelby County averages 4.27 m/s; at 50 m it is 6.32 m/s. That gives a shear exponent of 0.244, typical of ordinary open country. Going from 20 m to 50 m takes output from 12,899 to 22,077 kWh a year, 71% more, before counting the extra cost of the taller tower. Why tower height decides it explains the shear behind these numbers.

Hub heightAverage windOutputPayback
20 m5.05 m/s12,899 kWh46 years
30 m5.58 m/s16,612 kWh35 years
40 m5.99 m/s19,594 kWh30 years
50 m6.32 m/s22,077 kWh27 years

Counties around Shelby County

2 of the 6 closest counties are windier at turbine height; the windiest, Hancock County, averages 5.87 m/s.

Sun versus wind in Shelby County

Shelby County gets 3.99 kWh of sunshine per square metre a day on average. One kW of solar panels here would make roughly 1,165 kWh a year; one kW of the turbine above makes 1,662. This is one of the rare places where a kilowatt of turbine out-produces a kilowatt of panels, by 1.4 times. Panel output assumes an 80% system performance ratio. Wind or solar runs the same comparison for every county.

How this is worked out

Wind is NASA's Power climate record, the 2001-2025 average at 10 m and 50 m for the county's centre, carried to 30 m with this county's own measured wind shear and spread into hours with a Rayleigh distribution. The turbine is a generic 10 kW, 7 m rotor machine with 10% losses. Cost is $10,000 per kW installed with no tax credit, because the federal one ended in 2025. One county-centre number cannot see your hilltop or your tree line, so treat it as the starting point for a site survey, not a substitute. The full method and its weak spots are in how the numbers are made.