TurbinePayback

Wind Turbine Payback in Skagit County, WA

Wind turbine payback in Skagit County

No. The turbine wears out before it pays for itself.

At 30 m, the height a home turbine tower usually reaches, the wind in Skagit County, WA averages 2.34 m/s (5.2 mph). A 10 kW turbine there would make about 1,043 kWh a year, worth $150 at WA's 14.42¢/kWh. Against an installed cost of about $100,000, that is a payback of over 100 years, and the turbine is built to last about 20.

What to do in Skagit County

A home turbine is not worth buying for savings in Skagit County unless your spot is far windier than the county average, 8.1 m/s at the hub against 2.34 m/s here. Per kW, solar panels would make about 1,025 kWh a year here against the turbine's 104, so get a solar quote first.

What would have to change

Against the rest of WA

Skagit County is the 3,143rd windiest of 3,144 US counties at turbine height; the national middle is 4.79 m/s. The windiest in WA is Columbia County at 5.18 m/s, payback 50 years.

Month by month in Skagit County

January is the strongest month here, at 3.04 m/s and about 231 kWh. August is the weakest, 1.65 m/s and 16 kWh, so the best month makes 14.4 times the worst. November to March brings in 74% of the year's output in Skagit County.

MonthWind at 30 mOutputWorth
January3.04 m/s231 kWh$33
February2.68 m/s134 kWh$19
March2.71 m/s155 kWh$22
April2.30 m/s80 kWh$12
May1.93 m/s38 kWh$5
June1.82 m/s27 kWh$4
July1.65 m/s16 kWh$2
August1.65 m/s16 kWh$2
September1.97 m/s40 kWh$6
October2.44 m/s105 kWh$15
November2.91 m/s194 kWh$28
December2.97 m/s214 kWh$31

What a taller tower would buy

Measured at 10 m the wind in Skagit County averages 1.62 m/s; at 50 m it is 2.78 m/s. That gives a shear exponent of 0.336, typical of rough, sheltered ground: trees or buildings slow the low wind a lot. Going from 20 m to 50 m takes output from 582 to 1,995 kWh a year, 243% more, before counting the extra cost of the taller tower. Why tower height decides it explains the shear behind these numbers.

Hub heightAverage windOutputPayback
20 m2.04 m/s582 kWhover 100 years
30 m2.34 m/s1,045 kWhover 100 years
40 m2.58 m/s1,519 kWhover 100 years
50 m2.78 m/s1,995 kWhover 100 years

Counties around Skagit County

5 of the 6 closest counties are windier at turbine height; the windiest, San Juan County, averages 3.83 m/s.

Sun versus wind in Skagit County

Skagit County gets 3.51 kWh of sunshine per square metre a day on average. One kW of solar panels here would make roughly 1,025 kWh a year; one kW of the turbine above makes 104. Kilowatt for kilowatt, panels make 9.9 times as much here as the turbine. Panel output assumes an 80% system performance ratio. Wind or solar runs the same comparison for every county.

How this is worked out

Wind is NASA's Power climate record, the 2001-2025 average at 10 m and 50 m for the county's centre, carried to 30 m with this county's own measured wind shear and spread into hours with a Rayleigh distribution. The turbine is a generic 10 kW, 7 m rotor machine with 10% losses. Cost is $10,000 per kW installed with no tax credit, because the federal one ended in 2025. One county-centre number cannot see your hilltop or your tree line, so treat it as the starting point for a site survey, not a substitute. The full method and its weak spots are in how the numbers are made.