Wind turbine payback in Spokane County

No. The turbine wears out before it pays for itself.

At 30 m, the height a home turbine tower usually reaches, the wind in Spokane County, WA averages 4.42 m/s (9.9 mph). A 10 kW turbine there would make about 8,865 kWh a year, worth $1,278 at WA's 14.42¢/kWh. Against an installed cost of about $100,000, that is a payback of 78 years, and the turbine is built to last about 20.

What to do in Spokane County

A home turbine is not worth buying for savings in Spokane County unless your spot is far windier than the county average, 8.1 m/s at the hub against 4.42 m/s here. Per kW, solar panels would make about 1,121 kWh a year here against the turbine's 887, so get a solar quote first.

What would have to change

Against the rest of WA

Spokane County is the 1,799th windiest of 3,144 US counties at turbine height; the national middle is 4.79 m/s. The windiest in WA is Columbia County at 5.18 m/s, payback 50 years.

Month by month in Spokane County

March is the strongest month here, at 5.04 m/s and about 1,085 kWh. August is the weakest, 3.90 m/s and 515 kWh, so the best month makes 2.1 times the worst. November to March brings in 48% of the year's output in Spokane County.

MonthWind at 30 mOutputWorth
January4.59 m/s839 kWh$121
February4.49 m/s713 kWh$103
March5.04 m/s1,085 kWh$156
April4.73 m/s884 kWh$127
May4.27 m/s682 kWh$98
June4.26 m/s656 kWh$95
July4.01 m/s563 kWh$81
August3.90 m/s515 kWh$74
September4.10 m/s582 kWh$84
October4.47 m/s776 kWh$112
November4.71 m/s875 kWh$126
December4.49 m/s789 kWh$114

What a taller tower would buy

Measured at 10 m the wind in Spokane County averages 3.34 m/s; at 50 m it is 5.04 m/s. That gives a shear exponent of 0.256, typical of ordinary open country. Going from 20 m to 50 m takes output from 6,508 to 12,805 kWh a year, 97% more, before counting the extra cost of the taller tower. Why tower height decides it explains the shear behind these numbers.

Hub heightAverage windOutputPayback
20 m3.99 m/s6,508 kWhover 100 years
30 m4.42 m/s8,878 kWh78 years
40 m4.76 m/s10,955 kWh63 years
50 m5.04 m/s12,805 kWh54 years

Counties around Spokane County

2 of the 6 closest counties are windier at turbine height; the windiest, Lincoln County, averages 4.88 m/s.

Sun versus wind in Spokane County

Spokane County gets 3.84 kWh of sunshine per square metre a day on average. One kW of solar panels here would make roughly 1,121 kWh a year; one kW of the turbine above makes 887. Kilowatt for kilowatt, panels make 1.3 times as much here as the turbine. Panel output assumes an 80% system performance ratio. Wind or solar runs the same comparison for every county.

How this is worked out

Wind is NASA's Power climate record, the 2001-2025 average at 10 m and 50 m for the county's centre, carried to 30 m with this county's own measured wind shear and spread into hours with a Rayleigh distribution. The turbine is a generic 10 kW, 7 m rotor machine with 10% losses. Cost is $10,000 per kW installed with no tax credit, because the federal one ended in 2025. One county-centre number cannot see your hilltop or your tree line, so treat it as the starting point for a site survey, not a substitute. The full method and its weak spots are in how the numbers are made.