No. The turbine wears out before it pays for itself.

At 30 m, the height a home turbine tower usually reaches, the wind in Stewart County, TN averages 3.99 m/s (8.9 mph). A 10 kW turbine there would make about 6,527 kWh a year, worth $901 at TN's 13.8¢/kWh. Against an installed cost of about $100,000, that is a payback of over 100 years, and the turbine is built to last about 20.

What to do in Stewart County

A home turbine is not worth buying for savings in Stewart County unless your spot is far windier than the county average, 8.4 m/s at the hub against 3.99 m/s here. Per kW, solar panels would make about 1,241 kWh a year here against the turbine's 653, so get a solar quote first.

What would have to change

Against the rest of TN

Stewart County is the 2,064th windiest of 3,144 US counties at turbine height; the national middle is 4.79 m/s. The windiest in TN is Lake County at 5.54 m/s, payback 44 years.

Month by month in Stewart County

March is the strongest month here, at 4.73 m/s and about 913 kWh. July is the weakest, 2.96 m/s and 211 kWh, so the best month makes 4.3 times the worst. November to March brings in 57% of the year's output in Stewart County.

MonthWind at 30 mOutputWorth
January4.61 m/s850 kWh$117
February4.69 m/s804 kWh$111
March4.73 m/s913 kWh$126
April4.72 m/s879 kWh$121
May3.87 m/s504 kWh$70
June3.27 m/s285 kWh$39
July2.96 m/s211 kWh$29
August3.03 m/s228 kWh$31
September3.43 m/s335 kWh$46
October3.96 m/s542 kWh$75
November4.29 m/s665 kWh$92
December4.39 m/s740 kWh$102

What a taller tower would buy

Measured at 10 m the wind in Stewart County averages 2.7 m/s; at 50 m it is 4.79 m/s. That gives a shear exponent of 0.356, typical of rough, sheltered ground: trees or buildings slow the low wind a lot. Going from 20 m to 50 m takes output from 4,159 to 11,147 kWh a year, 168% more, before counting the extra cost of the taller tower. Why tower height decides it explains the shear behind these numbers.

Hub heightAverage windOutputPayback
20 m3.46 m/s4,159 kWhover 100 years
30 m3.99 m/s6,545 kWhover 100 years
40 m4.42 m/s8,890 kWh82 years
50 m4.79 m/s11,147 kWh65 years

Counties around Stewart County

3 of the 6 closest counties are windier at turbine height; the windiest, Trigg County, averages 4.94 m/s.

Sun versus wind in Stewart County

Stewart County gets 4.25 kWh of sunshine per square metre a day on average. One kW of solar panels here would make roughly 1,241 kWh a year; one kW of the turbine above makes 653. Kilowatt for kilowatt, panels make 1.9 times as much here as the turbine. Panel output assumes an 80% system performance ratio. Wind or solar runs the same comparison for every county.

How this is worked out

Wind is NASA's Power climate record, the 2001-2025 average at 10 m and 50 m for the county's centre, carried to 30 m with this county's own measured wind shear and spread into hours with a Rayleigh distribution. The turbine is a generic 10 kW, 7 m rotor machine with 10% losses. Cost is $10,000 per kW installed with no tax credit, because the federal one ended in 2025. One county-centre number cannot see your hilltop or your tree line, so treat it as the starting point for a site survey, not a substitute. The full method and its weak spots are in how the numbers are made.