No. The turbine wears out before it pays for itself.

At 30 m, the height a home turbine tower usually reaches, the wind in Stone County, AR averages 3.32 m/s (7.4 mph). A 10 kW turbine there would make about 3,648 kWh a year, worth $501 at AR's 13.74¢/kWh. Against an installed cost of about $100,000, that is a payback of over 100 years, and the turbine is built to last about 20.

What to do in Stone County

A home turbine is not worth buying for savings in Stone County unless your spot is far windier than the county average, 8.4 m/s at the hub against 3.32 m/s here. Per kW, solar panels would make about 1,279 kWh a year here against the turbine's 365, so get a solar quote first.

What would have to change

Against the rest of AR

Stone County is the 2,715th windiest of 3,144 US counties at turbine height; the national middle is 4.79 m/s. The windiest in AR is Mississippi County at 5.35 m/s, payback 49 years.

Month by month in Stone County

March is the strongest month here, at 3.90 m/s and about 517 kWh. July is the weakest, 2.53 m/s and 120 kWh, so the best month makes 4.3 times the worst. November to March brings in 56% of the year's output in Stone County.

MonthWind at 30 mOutputWorth
January3.79 m/s473 kWh$65
February3.86 m/s453 kWh$62
March3.90 m/s517 kWh$71
April3.90 m/s501 kWh$69
May3.30 m/s304 kWh$42
June2.81 m/s170 kWh$23
July2.53 m/s120 kWh$16
August2.56 m/s125 kWh$17
September2.86 m/s181 kWh$25
October3.28 m/s297 kWh$41
November3.55 m/s371 kWh$51
December3.57 m/s391 kWh$54

What a taller tower would buy

Measured at 10 m the wind in Stone County averages 2.01 m/s; at 50 m it is 4.2 m/s. That gives a shear exponent of 0.458, typical of rough, sheltered ground: trees or buildings slow the low wind a lot. Going from 20 m to 50 m takes output from 1,946 to 7,623 kWh a year, 292% more, before counting the extra cost of the taller tower. Why tower height decides it explains the shear behind these numbers.

Hub heightAverage windOutputPayback
20 m2.76 m/s1,946 kWhover 100 years
30 m3.32 m/s3,662 kWhover 100 years
40 m3.79 m/s5,577 kWhover 100 years
50 m4.2 m/s7,623 kWh96 years

Counties around Stone County

5 of the 6 closest counties are windier at turbine height; the windiest, Independence County, averages 4.7 m/s.

Sun versus wind in Stone County

Stone County gets 4.38 kWh of sunshine per square metre a day on average. One kW of solar panels here would make roughly 1,279 kWh a year; one kW of the turbine above makes 365. Kilowatt for kilowatt, panels make 3.5 times as much here as the turbine. Panel output assumes an 80% system performance ratio. Wind or solar runs the same comparison for every county.

How this is worked out

Wind is NASA's Power climate record, the 2001-2025 average at 10 m and 50 m for the county's centre, carried to 30 m with this county's own measured wind shear and spread into hours with a Rayleigh distribution. The turbine is a generic 10 kW, 7 m rotor machine with 10% losses. Cost is $10,000 per kW installed with no tax credit, because the federal one ended in 2025. One county-centre number cannot see your hilltop or your tree line, so treat it as the starting point for a site survey, not a substitute. The full method and its weak spots are in how the numbers are made.