Wind Turbine Payback in Surry County, VA

Wind turbine payback in Surry County

No. The turbine wears out before it pays for itself.

At 30 m, the height a home turbine tower usually reaches, the wind in Surry County, VA averages 4.22 m/s (9.4 mph). A 10 kW turbine there would make about 7,732 kWh a year, worth $1,311 at VA's 16.95¢/kWh. Against an installed cost of about $100,000, that is a payback of 76 years, and the turbine is built to last about 20.

What to do in Surry County

A home turbine is not worth buying for savings in Surry County unless your spot is far windier than the county average, 7.3 m/s at the hub against 4.22 m/s here. Per kW, solar panels would make about 1,259 kWh a year here against the turbine's 773, so get a solar quote first.

What would have to change

Against the rest of VA

Surry County is the 1,935th windiest of 3,144 US counties at turbine height; the national middle is 4.79 m/s. The windiest in VA is Northampton County at 7.01 m/s, payback 22 years.

Month by month in Surry County

March is the strongest month here, at 4.85 m/s and about 981 kWh. August is the weakest, 3.36 m/s and 322 kWh, so the best month makes 3.0 times the worst. November to March brings in 52% of the year's output in Surry County.

MonthWind at 30 mOutputWorth
January4.64 m/s867 kWh$147
February4.79 m/s857 kWh$145
March4.85 m/s981 kWh$166
April4.85 m/s949 kWh$161
May4.21 m/s651 kWh$110
June3.72 m/s432 kWh$73
July3.50 m/s369 kWh$63
August3.36 m/s322 kWh$55
September3.85 m/s482 kWh$82
October4.13 m/s616 kWh$104
November4.36 m/s699 kWh$118
December4.42 m/s755 kWh$128

What a taller tower would buy

Measured at 10 m the wind in Surry County averages 2.89 m/s; at 50 m it is 5.04 m/s. That gives a shear exponent of 0.346, typical of rough, sheltered ground: trees or buildings slow the low wind a lot. Going from 20 m to 50 m takes output from 5,037 to 12,805 kWh a year, 154% more, before counting the extra cost of the taller tower. Why tower height decides it explains the shear behind these numbers.

Hub heightAverage windOutputPayback
20 m3.67 m/s5,037 kWhover 100 years
30 m4.22 m/s7,751 kWh76 years
40 m4.67 m/s10,354 kWh57 years
50 m5.04 m/s12,805 kWh46 years

Counties around Surry County

1 of the 6 closest counties is windier at turbine height; the windiest, Newport News city, averages 5.92 m/s.

Sun versus wind in Surry County

Surry County gets 4.31 kWh of sunshine per square metre a day on average. One kW of solar panels here would make roughly 1,259 kWh a year; one kW of the turbine above makes 773. Kilowatt for kilowatt, panels make 1.6 times as much here as the turbine. Panel output assumes an 80% system performance ratio. Wind or solar runs the same comparison for every county.

How this is worked out

Wind is NASA's Power climate record, the 2001-2025 average at 10 m and 50 m for the county's centre, carried to 30 m with this county's own measured wind shear and spread into hours with a Rayleigh distribution. The turbine is a generic 10 kW, 7 m rotor machine with 10% losses. Cost is $10,000 per kW installed with no tax credit, because the federal one ended in 2025. One county-centre number cannot see your hilltop or your tree line, so treat it as the starting point for a site survey, not a substitute. The full method and its weak spots are in how the numbers are made.