Wind Turbine Payback in Sutton County, TX

Wind turbine payback in Sutton County

No. The turbine wears out before it pays for itself.

At 30 m, the height a home turbine tower usually reaches, the wind in Sutton County, TX averages 6.28 m/s (14 mph). A 10 kW turbine there would make about 21,781 kWh a year, worth $3,491 at TX's 16.03¢/kWh. Against an installed cost of about $100,000, that is a payback of 29 years, and the turbine is built to last about 20.

What to do in Sutton County

A home turbine is not worth buying for savings in Sutton County unless your spot is far windier than the county average, 7.6 m/s at the hub against 6.28 m/s here. Per kW, solar panels would make about 1,507 kWh a year here against the turbine's 2,178, so get a solar quote first.

What would have to change

Against the rest of TX

Sutton County is the 498th windiest of 3,144 US counties at turbine height; the national middle is 4.79 m/s. The windiest in TX is Dallam County at 6.82 m/s, payback 24 years.

Month by month in Sutton County

April is the strongest month here, at 7.09 m/s and about 2,278 kWh. September is the weakest, 5.52 m/s and 1,333 kWh, so the best month makes 1.7 times the worst. November to March brings in 43% of the year's output in Sutton County.

MonthWind at 30 mOutputWorth
January6.18 m/s1,787 kWh$286
February6.54 m/s1,817 kWh$291
March6.80 m/s2,174 kWh$348
April7.09 m/s2,278 kWh$365
May6.74 m/s2,140 kWh$343
June6.41 m/s1,871 kWh$300
July5.86 m/s1,584 kWh$254
August5.56 m/s1,399 kWh$224
September5.52 m/s1,333 kWh$214
October6.22 m/s1,815 kWh$291
November6.32 m/s1,816 kWh$291
December6.17 m/s1,781 kWh$285

What a taller tower would buy

Measured at 10 m the wind in Sutton County averages 4.97 m/s; at 50 m it is 7 m/s. That gives a shear exponent of 0.213, typical of ordinary open country. Going from 20 m to 50 m takes output from 17,924 to 27,043 kWh a year, 51% more, before counting the extra cost of the taller tower. Why tower height decides it explains the shear behind these numbers.

Hub heightAverage windOutputPayback
20 m5.76 m/s17,924 kWh35 years
30 m6.28 m/s21,768 kWh29 years
40 m6.68 m/s24,692 kWh25 years
50 m7 m/s27,043 kWh23 years

Counties around Sutton County

1 of the 6 closest counties is windier at turbine height; the windiest, Schleicher County, averages 6.39 m/s.

Sun versus wind in Sutton County

Sutton County gets 5.16 kWh of sunshine per square metre a day on average. One kW of solar panels here would make roughly 1,507 kWh a year; one kW of the turbine above makes 2,178. This is one of the rare places where a kilowatt of turbine out-produces a kilowatt of panels, by 1.4 times. Panel output assumes an 80% system performance ratio. Wind or solar runs the same comparison for every county.

How this is worked out

Wind is NASA's Power climate record, the 2001-2025 average at 10 m and 50 m for the county's centre, carried to 30 m with this county's own measured wind shear and spread into hours with a Rayleigh distribution. The turbine is a generic 10 kW, 7 m rotor machine with 10% losses. Cost is $10,000 per kW installed with no tax credit, because the federal one ended in 2025. One county-centre number cannot see your hilltop or your tree line, so treat it as the starting point for a site survey, not a substitute. The full method and its weak spots are in how the numbers are made.