Wind Turbine Payback in Tama County, IA

Wind turbine payback in Tama County

No. The turbine wears out before it pays for itself.

At 30 m, the height a home turbine tower usually reaches, the wind in Tama County, IA averages 6.18 m/s (13.8 mph). A 10 kW turbine there would make about 21,039 kWh a year, worth $3,061 at IA's 14.55¢/kWh. Against an installed cost of about $100,000, that is a payback of 33 years, and the turbine is built to last about 20.

What to do in Tama County

A home turbine is not worth buying for savings in Tama County unless your spot is far windier than the county average, 8.1 m/s at the hub against 6.18 m/s here. Per kW, solar panels would make about 1,174 kWh a year here against the turbine's 2,104, so get a solar quote first.

What would have to change

Against the rest of IA

Tama County is the 599th windiest of 3,144 US counties at turbine height; the national middle is 4.79 m/s. The windiest in IA is Dickinson County at 6.59 m/s, payback 29 years.

Month by month in Tama County

April is the strongest month here, at 7.12 m/s and about 2,292 kWh. August is the weakest, 4.87 m/s and 993 kWh, so the best month makes 2.3 times the worst. November to March brings in 48% of the year's output in Tama County.

MonthWind at 30 mOutputWorth
January6.60 m/s2,052 kWh$299
February6.60 m/s1,853 kWh$270
March6.77 m/s2,157 kWh$314
April7.12 m/s2,292 kWh$333
May6.38 m/s1,912 kWh$278
June5.57 m/s1,359 kWh$198
July4.87 m/s993 kWh$144
August4.87 m/s993 kWh$144
September5.80 m/s1,498 kWh$218
October6.46 m/s1,963 kWh$286
November6.65 m/s2,012 kWh$293
December6.41 m/s1,929 kWh$281

What a taller tower would buy

Measured at 10 m the wind in Tama County averages 4.82 m/s; at 50 m it is 6.93 m/s. That gives a shear exponent of 0.226, typical of ordinary open country. Going from 20 m to 50 m takes output from 17,008 to 26,541 kWh a year, 56% more, before counting the extra cost of the taller tower. Why tower height decides it explains the shear behind these numbers.

Hub heightAverage windOutputPayback
20 m5.63 m/s17,008 kWh40 years
30 m6.17 m/s20,998 kWh33 years
40 m6.59 m/s24,063 kWh29 years
50 m6.93 m/s26,541 kWh26 years

Counties around Tama County

1 of the 6 closest counties is windier at turbine height; the windiest, Marshall County, averages 6.2 m/s.

Sun versus wind in Tama County

Tama County gets 4.02 kWh of sunshine per square metre a day on average. One kW of solar panels here would make roughly 1,174 kWh a year; one kW of the turbine above makes 2,104. This is one of the rare places where a kilowatt of turbine out-produces a kilowatt of panels, by 1.8 times. Panel output assumes an 80% system performance ratio. Wind or solar runs the same comparison for every county.

How this is worked out

Wind is NASA's Power climate record, the 2001-2025 average at 10 m and 50 m for the county's centre, carried to 30 m with this county's own measured wind shear and spread into hours with a Rayleigh distribution. The turbine is a generic 10 kW, 7 m rotor machine with 10% losses. Cost is $10,000 per kW installed with no tax credit, because the federal one ended in 2025. One county-centre number cannot see your hilltop or your tree line, so treat it as the starting point for a site survey, not a substitute. The full method and its weak spots are in how the numbers are made.