Wind turbine payback in Washington County

No. The turbine wears out before it pays for itself.

At 30 m, the height a home turbine tower usually reaches, the wind in Washington County, IL averages 5.65 m/s (12.6 mph). A 10 kW turbine there would make about 17,126 kWh a year, worth $3,293 at IL's 19.23¢/kWh. Against an installed cost of about $100,000, that is a payback of 30 years, and the turbine is built to last about 20.

What to do in Washington County

A home turbine is not worth buying for savings in Washington County unless your spot is far windier than the county average, 6.8 m/s at the hub against 5.65 m/s here. Per kW, solar panels would make about 1,221 kWh a year here against the turbine's 1,713, so get a solar quote first.

What would have to change

Against the rest of IL

Washington County is the 1,147th windiest of 3,144 US counties at turbine height; the national middle is 4.79 m/s. The windiest in IL is Cook County at 6.73 m/s, payback 21 years.

Month by month in Washington County

April is the strongest month here, at 6.66 m/s and about 2,020 kWh. July is the weakest, 4.20 m/s and 649 kWh, so the best month makes 3.1 times the worst. November to March brings in 53% of the year's output in Washington County.

MonthWind at 30 mOutputWorth
January6.38 m/s1,911 kWh$367
February6.34 m/s1,706 kWh$328
March6.48 m/s1,977 kWh$380
April6.66 m/s2,020 kWh$388
May5.66 m/s1,462 kWh$281
June4.86 m/s953 kWh$183
July4.20 m/s649 kWh$125
August4.24 m/s666 kWh$128
September4.73 m/s882 kWh$170
October5.85 m/s1,578 kWh$303
November6.32 m/s1,817 kWh$349
December6.19 m/s1,794 kWh$345

What a taller tower would buy

Measured at 10 m the wind in Washington County averages 4.33 m/s; at 50 m it is 6.4 m/s. That gives a shear exponent of 0.243, typical of ordinary open country. Going from 20 m to 50 m takes output from 13,370 to 22,669 kWh a year, 70% more, before counting the extra cost of the taller tower. Why tower height decides it explains the shear behind these numbers.

Hub heightAverage windOutputPayback
20 m5.12 m/s13,370 kWh39 years
30 m5.65 m/s17,147 kWh30 years
40 m6.06 m/s20,165 kWh26 years
50 m6.4 m/s22,669 kWh23 years

Counties around Washington County

2 of the 6 closest counties are windier at turbine height; the windiest, Jefferson County, averages 5.71 m/s.

Sun versus wind in Washington County

Washington County gets 4.18 kWh of sunshine per square metre a day on average. One kW of solar panels here would make roughly 1,221 kWh a year; one kW of the turbine above makes 1,713. This is one of the rare places where a kilowatt of turbine out-produces a kilowatt of panels, by 1.4 times. Panel output assumes an 80% system performance ratio. Wind or solar runs the same comparison for every county.

How this is worked out

Wind is NASA's Power climate record, the 2001-2025 average at 10 m and 50 m for the county's centre, carried to 30 m with this county's own measured wind shear and spread into hours with a Rayleigh distribution. The turbine is a generic 10 kW, 7 m rotor machine with 10% losses. Cost is $10,000 per kW installed with no tax credit, because the federal one ended in 2025. One county-centre number cannot see your hilltop or your tree line, so treat it as the starting point for a site survey, not a substitute. The full method and its weak spots are in how the numbers are made.