Wind Turbine Payback in Weld County, CO

Wind turbine payback in Weld County

No. The turbine wears out before it pays for itself.

At 30 m, the height a home turbine tower usually reaches, the wind in Weld County, CO averages 4.95 m/s (11.1 mph). A 10 kW turbine there would make about 12,199 kWh a year, worth $2,049 at CO's 16.8¢/kWh. Against an installed cost of about $100,000, that is a payback of 49 years, and the turbine is built to last about 20.

What to do in Weld County

A home turbine is not worth buying for savings in Weld County unless your spot is far windier than the county average, 7.4 m/s at the hub against 4.95 m/s here. Per kW, solar panels would make about 1,378 kWh a year here against the turbine's 1,220, so get a solar quote first.

What would have to change

Against the rest of CO

Weld County is the 1,479th windiest of 3,144 US counties at turbine height; the national middle is 4.79 m/s. The windiest in CO is Baca County at 6.65 m/s, payback 24 years.

Month by month in Weld County

April is the strongest month here, at 5.66 m/s and about 1,414 kWh. July is the weakest, 4.20 m/s and 647 kWh, so the best month makes 2.2 times the worst. November to March brings in 48% of the year's output in Weld County.

MonthWind at 30 mOutputWorth
January5.35 m/s1,272 kWh$214
February5.25 m/s1,096 kWh$184
March5.55 m/s1,390 kWh$234
April5.66 m/s1,414 kWh$238
May4.86 m/s983 kWh$165
June4.58 m/s808 kWh$136
July4.20 m/s647 kWh$109
August4.24 m/s668 kWh$112
September4.58 m/s808 kWh$136
October5.01 m/s1,073 kWh$180
November5.03 m/s1,048 kWh$176
December5.09 m/s1,119 kWh$188

What a taller tower would buy

Measured at 10 m the wind in Weld County averages 3.82 m/s; at 50 m it is 5.59 m/s. That gives a shear exponent of 0.237, typical of ordinary open country. Going from 20 m to 50 m takes output from 9,332 to 16,689 kWh a year, 79% more, before counting the extra cost of the taller tower. Why tower height decides it explains the shear behind these numbers.

Hub heightAverage windOutputPayback
20 m4.5 m/s9,332 kWh64 years
30 m4.95 m/s12,216 kWh49 years
40 m5.3 m/s14,623 kWh41 years
50 m5.59 m/s16,689 kWh36 years

Counties around Weld County

4 of the 6 closest counties are windier at turbine height; the windiest, Laramie County, averages 6.76 m/s.

Sun versus wind in Weld County

Weld County gets 4.72 kWh of sunshine per square metre a day on average. One kW of solar panels here would make roughly 1,378 kWh a year; one kW of the turbine above makes 1,220. Kilowatt for kilowatt, panels make 1.1 times as much here as the turbine. Panel output assumes an 80% system performance ratio. Wind or solar runs the same comparison for every county.

How this is worked out

Wind is NASA's Power climate record, the 2001-2025 average at 10 m and 50 m for the county's centre, carried to 30 m with this county's own measured wind shear and spread into hours with a Rayleigh distribution. The turbine is a generic 10 kW, 7 m rotor machine with 10% losses. Cost is $10,000 per kW installed with no tax credit, because the federal one ended in 2025. One county-centre number cannot see your hilltop or your tree line, so treat it as the starting point for a site survey, not a substitute. The full method and its weak spots are in how the numbers are made.