No. The turbine wears out before it pays for itself.
At 30 m, the height a home turbine tower usually reaches, the wind in Winneshiek County, IA averages 6.22 m/s (13.9 mph). A 10 kW turbine there would make about 21,336 kWh a year, worth $3,104 at IA's 14.55¢/kWh. Against an installed cost of about $100,000, that is a payback of 32 years, and the turbine is built to last about 20.
What to do in Winneshiek County
A home turbine is not worth buying for savings in Winneshiek County unless your spot is far windier than the county average, 8.1 m/s at the hub against 6.22 m/s here. Per kW, solar panels would make about 1,136 kWh a year here against the turbine's 2,134, so get a solar quote first.
What would have to change
- Power would have to cost 23¢/kWh, 1.6 times what IA pays now.
- Or the average wind at the hub would have to be 8.1 m/s instead of 6.22. A taller tower or an exposed ridge can add some of that; a rooftop never will.
Against the rest of IA
Winneshiek County is the 566th windiest of 3,144 US counties at turbine height; the national middle is 4.79 m/s. The windiest in IA is Dickinson County at 6.59 m/s, payback 29 years.
Month by month in Winneshiek County
April is the strongest month here, at 6.97 m/s and about 2,202 kWh. August is the weakest, 4.96 m/s and 1,043 kWh, so the best month makes 2.1 times the worst. November to March brings in 48% of the year's output in Winneshiek County.
| Month | Wind at 30 m | Output | Worth |
|---|---|---|---|
| January | 6.81 m/s | 2,183 kWh | $318 |
| February | 6.85 m/s | 1,991 kWh | $290 |
| March | 6.71 m/s | 2,116 kWh | $308 |
| April | 6.97 m/s | 2,202 kWh | $320 |
| May | 6.28 m/s | 1,848 kWh | $269 |
| June | 5.65 m/s | 1,408 kWh | $205 |
| July | 5.03 m/s | 1,079 kWh | $157 |
| August | 4.96 m/s | 1,043 kWh | $152 |
| September | 5.96 m/s | 1,592 kWh | $232 |
| October | 6.49 m/s | 1,983 kWh | $289 |
| November | 6.59 m/s | 1,978 kWh | $288 |
| December | 6.43 m/s | 1,944 kWh | $283 |
What a taller tower would buy
Measured at 10 m the wind in Winneshiek County averages 4.89 m/s; at 50 m it is 6.96 m/s. That gives a shear exponent of 0.219, typical of ordinary open country. Going from 20 m to 50 m takes output from 17,452 to 26,756 kWh a year, 53% more, before counting the extra cost of the taller tower. Why tower height decides it explains the shear behind these numbers.
| Hub height | Average wind | Output | Payback |
|---|---|---|---|
| 20 m | 5.69 m/s | 17,452 kWh | 39 years |
| 30 m | 6.22 m/s | 21,361 kWh | 32 years |
| 40 m | 6.63 m/s | 24,348 kWh | 28 years |
| 50 m | 6.96 m/s | 26,756 kWh | 26 years |
Counties around Winneshiek County
1 of the 6 closest counties is windier at turbine height; the windiest, Howard County, averages 6.37 m/s.
- Allamakee County, IA: 6.09 m/s, 20,371 kWh, payback 34 years (24 mi)
- Howard County, IA: 6.37 m/s, 22,447 kWh, payback 31 years (24 mi)
- Chickasaw County, IA: 6.21 m/s, 21,262 kWh, payback 32 years (28 mi)
- Fillmore County, MN: 6.22 m/s, 21,336 kWh, payback 29 years (29 mi)
- Fayette County, IA: 6.18 m/s, 21,039 kWh, payback 33 years (30 mi)
- Houston County, MN: 6.09 m/s, 20,371 kWh, payback 30 years (31 mi)
Sun versus wind in Winneshiek County
Winneshiek County gets 3.89 kWh of sunshine per square metre a day on average. One kW of solar panels here would make roughly 1,136 kWh a year; one kW of the turbine above makes 2,134. This is one of the rare places where a kilowatt of turbine out-produces a kilowatt of panels, by 1.9 times. Panel output assumes an 80% system performance ratio. Wind or solar runs the same comparison for every county.
How this is worked out
Wind is NASA's Power climate record, the 2001-2025 average at 10 m and 50 m for the county's centre, carried to 30 m with this county's own measured wind shear and spread into hours with a Rayleigh distribution. The turbine is a generic 10 kW, 7 m rotor machine with 10% losses. Cost is $10,000 per kW installed with no tax credit, because the federal one ended in 2025. One county-centre number cannot see your hilltop or your tree line, so treat it as the starting point for a site survey, not a substitute. The full method and its weak spots are in how the numbers are made.