Wind Turbine Payback in Winneshiek County, IA

Wind turbine payback in Winneshiek County

No. The turbine wears out before it pays for itself.

At 30 m, the height a home turbine tower usually reaches, the wind in Winneshiek County, IA averages 6.22 m/s (13.9 mph). A 10 kW turbine there would make about 21,336 kWh a year, worth $3,104 at IA's 14.55¢/kWh. Against an installed cost of about $100,000, that is a payback of 32 years, and the turbine is built to last about 20.

What to do in Winneshiek County

A home turbine is not worth buying for savings in Winneshiek County unless your spot is far windier than the county average, 8.1 m/s at the hub against 6.22 m/s here. Per kW, solar panels would make about 1,136 kWh a year here against the turbine's 2,134, so get a solar quote first.

What would have to change

Against the rest of IA

Winneshiek County is the 566th windiest of 3,144 US counties at turbine height; the national middle is 4.79 m/s. The windiest in IA is Dickinson County at 6.59 m/s, payback 29 years.

Month by month in Winneshiek County

April is the strongest month here, at 6.97 m/s and about 2,202 kWh. August is the weakest, 4.96 m/s and 1,043 kWh, so the best month makes 2.1 times the worst. November to March brings in 48% of the year's output in Winneshiek County.

MonthWind at 30 mOutputWorth
January6.81 m/s2,183 kWh$318
February6.85 m/s1,991 kWh$290
March6.71 m/s2,116 kWh$308
April6.97 m/s2,202 kWh$320
May6.28 m/s1,848 kWh$269
June5.65 m/s1,408 kWh$205
July5.03 m/s1,079 kWh$157
August4.96 m/s1,043 kWh$152
September5.96 m/s1,592 kWh$232
October6.49 m/s1,983 kWh$289
November6.59 m/s1,978 kWh$288
December6.43 m/s1,944 kWh$283

What a taller tower would buy

Measured at 10 m the wind in Winneshiek County averages 4.89 m/s; at 50 m it is 6.96 m/s. That gives a shear exponent of 0.219, typical of ordinary open country. Going from 20 m to 50 m takes output from 17,452 to 26,756 kWh a year, 53% more, before counting the extra cost of the taller tower. Why tower height decides it explains the shear behind these numbers.

Hub heightAverage windOutputPayback
20 m5.69 m/s17,452 kWh39 years
30 m6.22 m/s21,361 kWh32 years
40 m6.63 m/s24,348 kWh28 years
50 m6.96 m/s26,756 kWh26 years

Counties around Winneshiek County

1 of the 6 closest counties is windier at turbine height; the windiest, Howard County, averages 6.37 m/s.

Sun versus wind in Winneshiek County

Winneshiek County gets 3.89 kWh of sunshine per square metre a day on average. One kW of solar panels here would make roughly 1,136 kWh a year; one kW of the turbine above makes 2,134. This is one of the rare places where a kilowatt of turbine out-produces a kilowatt of panels, by 1.9 times. Panel output assumes an 80% system performance ratio. Wind or solar runs the same comparison for every county.

How this is worked out

Wind is NASA's Power climate record, the 2001-2025 average at 10 m and 50 m for the county's centre, carried to 30 m with this county's own measured wind shear and spread into hours with a Rayleigh distribution. The turbine is a generic 10 kW, 7 m rotor machine with 10% losses. Cost is $10,000 per kW installed with no tax credit, because the federal one ended in 2025. One county-centre number cannot see your hilltop or your tree line, so treat it as the starting point for a site survey, not a substitute. The full method and its weak spots are in how the numbers are made.