Wind Turbine Payback in Woodford County, KY

Wind turbine payback in Woodford County

No. The turbine wears out before it pays for itself.

At 30 m, the height a home turbine tower usually reaches, the wind in Woodford County, KY averages 4.62 m/s (10.3 mph). A 10 kW turbine there would make about 10,070 kWh a year, worth $1,430 at KY's 14.2¢/kWh. Against an installed cost of about $100,000, that is a payback of 70 years, and the turbine is built to last about 20.

What to do in Woodford County

A home turbine is not worth buying for savings in Woodford County unless your spot is far windier than the county average, 8.2 m/s at the hub against 4.62 m/s here. Per kW, solar panels would make about 1,186 kWh a year here against the turbine's 1,007, so get a solar quote first.

What would have to change

Against the rest of KY

Woodford County is the 1,678th windiest of 3,144 US counties at turbine height; the national middle is 4.79 m/s. The windiest in KY is Fulton County at 5.54 m/s, payback 43 years.

Month by month in Woodford County

January is the strongest month here, at 5.43 m/s and about 1,318 kWh. August is the weakest, 3.44 m/s and 348 kWh, so the best month makes 3.8 times the worst. November to March brings in 56% of the year's output in Woodford County.

MonthWind at 30 mOutputWorth
January5.43 m/s1,318 kWh$187
February5.41 m/s1,181 kWh$168
March5.38 m/s1,292 kWh$183
April5.44 m/s1,280 kWh$182
May4.50 m/s792 kWh$112
June3.88 m/s492 kWh$70
July3.48 m/s362 kWh$51
August3.44 m/s348 kWh$49
September3.88 m/s492 kWh$70
October4.60 m/s846 kWh$120
November4.97 m/s1,014 kWh$144
December5.13 m/s1,138 kWh$162

What a taller tower would buy

Measured at 10 m the wind in Woodford County averages 3.34 m/s; at 50 m it is 5.37 m/s. That gives a shear exponent of 0.295, typical of ordinary open country. Going from 20 m to 50 m takes output from 7,080 to 15,105 kWh a year, 113% more, before counting the extra cost of the taller tower. Why tower height decides it explains the shear behind these numbers.

Hub heightAverage windOutputPayback
20 m4.1 m/s7,080 kWh100 years
30 m4.62 m/s10,063 kWh70 years
40 m5.03 m/s12,723 kWh55 years
50 m5.37 m/s15,105 kWh47 years

Counties around Woodford County

2 of the 6 closest counties are windier at turbine height; the windiest, Jessamine County, averages 4.7 m/s.

Sun versus wind in Woodford County

Woodford County gets 4.06 kWh of sunshine per square metre a day on average. One kW of solar panels here would make roughly 1,186 kWh a year; one kW of the turbine above makes 1,007. Kilowatt for kilowatt, panels make 1.2 times as much here as the turbine. Panel output assumes an 80% system performance ratio. Wind or solar runs the same comparison for every county.

How this is worked out

Wind is NASA's Power climate record, the 2001-2025 average at 10 m and 50 m for the county's centre, carried to 30 m with this county's own measured wind shear and spread into hours with a Rayleigh distribution. The turbine is a generic 10 kW, 7 m rotor machine with 10% losses. Cost is $10,000 per kW installed with no tax credit, because the federal one ended in 2025. One county-centre number cannot see your hilltop or your tree line, so treat it as the starting point for a site survey, not a substitute. The full method and its weak spots are in how the numbers are made.