TurbinePayback

Wind Turbine Payback in Yellow Medicine County, MN

Wind turbine payback in Yellow Medicine County

No. The turbine wears out before it pays for itself.

At 30 m, the height a home turbine tower usually reaches, the wind in Yellow Medicine County, MN averages 6.5 m/s (14.5 mph). A 10 kW turbine there would make about 23,407 kWh a year, worth $3,848 at MN's 16.44¢/kWh. Against an installed cost of about $100,000, that is a payback of 26 years, and the turbine is built to last about 20.

What to do in Yellow Medicine County

A home turbine is not worth buying for savings in Yellow Medicine County unless your spot is far windier than the county average, 7.5 m/s at the hub against 6.5 m/s here. Per kW, solar panels would make about 1,165 kWh a year here against the turbine's 2,341, so get a solar quote first.

What would have to change

Against the rest of MN

Yellow Medicine County is the 208th windiest of 3,144 US counties at turbine height; the national middle is 4.79 m/s. The windiest in MN is Lincoln County at 6.68 m/s, payback 25 years.

Month by month in Yellow Medicine County

April is the strongest month here, at 7.16 m/s and about 2,316 kWh. August is the weakest, 5.36 m/s and 1,278 kWh, so the best month makes 1.8 times the worst. November to March brings in 45% of the year's output in Yellow Medicine County.

MonthWind at 30 mOutputWorth
January6.80 m/s2,174 kWh$357
February6.79 m/s1,959 kWh$322
March6.84 m/s2,197 kWh$361
April7.16 m/s2,316 kWh$381
May6.73 m/s2,130 kWh$350
June6.04 m/s1,642 kWh$270
July5.39 m/s1,295 kWh$213
August5.36 m/s1,278 kWh$210
September6.49 m/s1,915 kWh$315
October6.90 m/s2,235 kWh$367
November6.90 m/s2,163 kWh$356
December6.64 m/s2,074 kWh$341

What a taller tower would buy

Measured at 10 m the wind in Yellow Medicine County averages 5.16 m/s; at 50 m it is 7.23 m/s. That gives a shear exponent of 0.210, typical of ordinary open country. Going from 20 m to 50 m takes output from 19,441 to 28,671 kWh a year, 47% more, before counting the extra cost of the taller tower. Why tower height decides it explains the shear behind these numbers.

Hub heightAverage windOutputPayback
20 m5.96 m/s19,441 kWh31 years
30 m6.49 m/s23,367 kWh26 years
40 m6.9 m/s26,318 kWh23 years
50 m7.23 m/s28,671 kWh21 years

Counties around Yellow Medicine County

1 of the 6 closest counties is windier at turbine height; the windiest, Lincoln County, averages 6.68 m/s.

Sun versus wind in Yellow Medicine County

Yellow Medicine County gets 3.99 kWh of sunshine per square metre a day on average. One kW of solar panels here would make roughly 1,165 kWh a year; one kW of the turbine above makes 2,341. This is one of the rare places where a kilowatt of turbine out-produces a kilowatt of panels, by 2.0 times. Panel output assumes an 80% system performance ratio. Wind or solar runs the same comparison for every county.

How this is worked out

Wind is NASA's Power climate record, the 2001-2025 average at 10 m and 50 m for the county's centre, carried to 30 m with this county's own measured wind shear and spread into hours with a Rayleigh distribution. The turbine is a generic 10 kW, 7 m rotor machine with 10% losses. Cost is $10,000 per kW installed with no tax credit, because the federal one ended in 2025. One county-centre number cannot see your hilltop or your tree line, so treat it as the starting point for a site survey, not a substitute. The full method and its weak spots are in how the numbers are made.