Wind turbine payback in Adams County

No. The turbine wears out before it pays for itself.

At 30 m, the height a home turbine tower usually reaches, the wind in Adams County, WA averages 4.83 m/s (10.8 mph). A 10 kW turbine there would make about 11,407 kWh a year, worth $1,645 at WA's 14.42¢/kWh. Against an installed cost of about $100,000, that is a payback of 61 years, and the turbine is built to last about 20.

What to do in Adams County

A home turbine is not worth buying for savings in Adams County unless your spot is far windier than the county average, 8.1 m/s at the hub against 4.83 m/s here. Per kW, solar panels would make about 1,200 kWh a year here against the turbine's 1,141, so get a solar quote first.

What would have to change

Against the rest of WA

Adams County is the 1,542nd windiest of 3,144 US counties at turbine height; the national middle is 4.79 m/s. The windiest in WA is Columbia County at 5.18 m/s, payback 50 years.

Month by month in Adams County

March is the strongest month here, at 5.48 m/s and about 1,348 kWh. August is the weakest, 4.17 m/s and 635 kWh, so the best month makes 2.1 times the worst. November to March brings in 49% of the year's output in Adams County.

MonthWind at 30 mOutputWorth
January5.02 m/s1,074 kWh$155
February5.10 m/s1,012 kWh$146
March5.48 m/s1,348 kWh$194
April5.10 m/s1,089 kWh$157
May4.61 m/s849 kWh$122
June4.62 m/s826 kWh$119
July4.26 m/s676 kWh$97
August4.17 m/s635 kWh$92
September4.50 m/s768 kWh$111
October4.91 m/s1,013 kWh$146
November5.23 m/s1,160 kWh$167
December5.01 m/s1,069 kWh$154

What a taller tower would buy

Measured at 10 m the wind in Adams County averages 3.74 m/s; at 50 m it is 5.44 m/s. That gives a shear exponent of 0.233, typical of ordinary open country. Going from 20 m to 50 m takes output from 8,715 to 15,605 kWh a year, 79% more, before counting the extra cost of the taller tower. Why tower height decides it explains the shear behind these numbers.

Hub heightAverage windOutputPayback
20 m4.39 m/s8,715 kWh80 years
30 m4.83 m/s11,404 kWh61 years
40 m5.16 m/s13,659 kWh51 years
50 m5.44 m/s15,605 kWh44 years

Counties around Adams County

3 of the 6 closest counties are windier at turbine height; the windiest, Columbia County, averages 5.18 m/s.

Sun versus wind in Adams County

Adams County gets 4.11 kWh of sunshine per square metre a day on average. One kW of solar panels here would make roughly 1,200 kWh a year; one kW of the turbine above makes 1,141. Kilowatt for kilowatt, panels make 1.1 times as much here as the turbine. Panel output assumes an 80% system performance ratio. Wind or solar runs the same comparison for every county.

How this is worked out

Wind is NASA's Power climate record, the 2001-2025 average at 10 m and 50 m for the county's centre, carried to 30 m with this county's own measured wind shear and spread into hours with a Rayleigh distribution. The turbine is a generic 10 kW, 7 m rotor machine with 10% losses. Cost is $10,000 per kW installed with no tax credit, because the federal one ended in 2025. One county-centre number cannot see your hilltop or your tree line, so treat it as the starting point for a site survey, not a substitute. The full method and its weak spots are in how the numbers are made.