TurbinePayback

Wind Turbine Payback in Grant County, WA

Wind turbine payback in Grant County

No. The turbine wears out before it pays for itself.

At 30 m, the height a home turbine tower usually reaches, the wind in Grant County, WA averages 4.55 m/s (10.2 mph). A 10 kW turbine there would make about 9,641 kWh a year, worth $1,390 at WA's 14.42¢/kWh. Against an installed cost of about $100,000, that is a payback of 72 years, and the turbine is built to last about 20.

What to do in Grant County

A home turbine is not worth buying for savings in Grant County unless your spot is far windier than the county average, 8.1 m/s at the hub against 4.55 m/s here. Per kW, solar panels would make about 1,200 kWh a year here against the turbine's 964, so get a solar quote first.

What would have to change

Against the rest of WA

Grant County is the 1,719th windiest of 3,144 US counties at turbine height; the national middle is 4.79 m/s. The windiest in WA is Columbia County at 5.18 m/s, payback 50 years.

Month by month in Grant County

March is the strongest month here, at 5.11 m/s and about 1,129 kWh. August is the weakest, 4.09 m/s and 599 kWh, so the best month makes 1.9 times the worst. November to March brings in 47% of the year's output in Grant County.

MonthWind at 30 mOutputWorth
January4.59 m/s839 kWh$121
February4.80 m/s861 kWh$124
March5.11 m/s1,129 kWh$163
April4.83 m/s937 kWh$135
May4.41 m/s749 kWh$108
June4.45 m/s742 kWh$107
July4.20 m/s647 kWh$93
August4.09 m/s599 kWh$86
September4.31 m/s675 kWh$97
October4.58 m/s835 kWh$120
November4.73 m/s885 kWh$128
December4.54 m/s812 kWh$117

What a taller tower would buy

Measured at 10 m the wind in Grant County averages 3.51 m/s; at 50 m it is 5.14 m/s. That gives a shear exponent of 0.237, typical of ordinary open country. Going from 20 m to 50 m takes output from 7,283 to 13,490 kWh a year, 85% more, before counting the extra cost of the taller tower. Why tower height decides it explains the shear behind these numbers.

Hub heightAverage windOutputPayback
20 m4.14 m/s7,283 kWh95 years
30 m4.55 m/s9,664 kWh72 years
40 m4.88 m/s11,703 kWh59 years
50 m5.14 m/s13,490 kWh51 years

Counties around Grant County

4 of the 6 closest counties are windier at turbine height; the windiest, Lincoln County, averages 4.88 m/s.

Sun versus wind in Grant County

Grant County gets 4.11 kWh of sunshine per square metre a day on average. One kW of solar panels here would make roughly 1,200 kWh a year; one kW of the turbine above makes 964. Kilowatt for kilowatt, panels make 1.2 times as much here as the turbine. Panel output assumes an 80% system performance ratio. Wind or solar runs the same comparison for every county.

How this is worked out

Wind is NASA's Power climate record, the 2001-2025 average at 10 m and 50 m for the county's centre, carried to 30 m with this county's own measured wind shear and spread into hours with a Rayleigh distribution. The turbine is a generic 10 kW, 7 m rotor machine with 10% losses. Cost is $10,000 per kW installed with no tax credit, because the federal one ended in 2025. One county-centre number cannot see your hilltop or your tree line, so treat it as the starting point for a site survey, not a substitute. The full method and its weak spots are in how the numbers are made.