Wind Turbine Payback in Androscoggin County, ME

Wind turbine payback in Androscoggin County

No. The turbine wears out before it pays for itself.

At 30 m, the height a home turbine tower usually reaches, the wind in Androscoggin County, ME averages 3.65 m/s (8.2 mph). A 10 kW turbine there would make about 4,948 kWh a year, worth $1,496 at ME's 30.23¢/kWh. Against an installed cost of about $100,000, that is a payback of 67 years, and the turbine is built to last about 20.

What to do in Androscoggin County

A home turbine is not worth buying for savings in Androscoggin County unless your spot is far windier than the county average, 5.6 m/s at the hub against 3.65 m/s here. Per kW, solar panels would make about 1,063 kWh a year here against the turbine's 495, so get a solar quote first.

What would have to change

Against the rest of ME

Androscoggin County is the 2,332nd windiest of 3,144 US counties at turbine height; the national middle is 4.79 m/s. The windiest in ME is Knox County at 6.26 m/s, payback 15 years.

Month by month in Androscoggin County

March is the strongest month here, at 4.49 m/s and about 789 kWh. July is the weakest, 2.79 m/s and 171 kWh, so the best month makes 4.6 times the worst. November to March brings in 61% of the year's output in Androscoggin County.

MonthWind at 30 mOutputWorth
January4.27 m/s680 kWh$206
February4.52 m/s728 kWh$220
March4.49 m/s789 kWh$239
April3.98 m/s533 kWh$161
May3.29 m/s301 kWh$91
June2.97 m/s207 kWh$63
July2.79 m/s171 kWh$52
August2.88 m/s192 kWh$58
September3.16 m/s255 kWh$77
October3.68 m/s430 kWh$130
November3.83 m/s474 kWh$143
December4.00 m/s558 kWh$169

What a taller tower would buy

Measured at 10 m the wind in Androscoggin County averages 2.4 m/s; at 50 m it is 4.44 m/s. That gives a shear exponent of 0.382, typical of rough, sheltered ground: trees or buildings slow the low wind a lot. Going from 20 m to 50 m takes output from 2,998 to 8,982 kWh a year, 200% more, before counting the extra cost of the taller tower. Why tower height decides it explains the shear behind these numbers.

Hub heightAverage windOutputPayback
20 m3.13 m/s2,998 kWhover 100 years
30 m3.65 m/s4,960 kWh67 years
40 m4.08 m/s6,972 kWh47 years
50 m4.44 m/s8,982 kWh37 years

Counties around Androscoggin County

1 of the 6 closest counties is windier at turbine height; the windiest, Lincoln County, averages 4.86 m/s.

Sun versus wind in Androscoggin County

Androscoggin County gets 3.64 kWh of sunshine per square metre a day on average. One kW of solar panels here would make roughly 1,063 kWh a year; one kW of the turbine above makes 495. Kilowatt for kilowatt, panels make 2.1 times as much here as the turbine. Panel output assumes an 80% system performance ratio. Wind or solar runs the same comparison for every county.

How this is worked out

Wind is NASA's Power climate record, the 2001-2025 average at 10 m and 50 m for the county's centre, carried to 30 m with this county's own measured wind shear and spread into hours with a Rayleigh distribution. The turbine is a generic 10 kW, 7 m rotor machine with 10% losses. Cost is $10,000 per kW installed with no tax credit, because the federal one ended in 2025. One county-centre number cannot see your hilltop or your tree line, so treat it as the starting point for a site survey, not a substitute. The full method and its weak spots are in how the numbers are made.