TurbinePayback

Wind Turbine Payback in Antelope County, NE

Wind turbine payback in Antelope County

No. The turbine wears out before it pays for itself.

At 30 m, the height a home turbine tower usually reaches, the wind in Antelope County, NE averages 6.71 m/s (15 mph). A 10 kW turbine there would make about 24,947 kWh a year, worth $3,223 at NE's 12.92¢/kWh. Against an installed cost of about $100,000, that is a payback of 31 years, and the turbine is built to last about 20.

What to do in Antelope County

A home turbine is not worth buying for savings in Antelope County unless your spot is far windier than the county average, 8.8 m/s at the hub against 6.71 m/s here. Per kW, solar panels would make about 1,244 kWh a year here against the turbine's 2,495, so get a solar quote first.

What would have to change

Against the rest of NE

Antelope County is the 59th windiest of 3,144 US counties at turbine height; the national middle is 4.79 m/s. The windiest in NE is Cherry County at 6.83 m/s, payback 30 years.

Month by month in Antelope County

April is the strongest month here, at 7.40 m/s and about 2,453 kWh. August is the weakest, 5.54 m/s and 1,388 kWh, so the best month makes 1.8 times the worst. November to March brings in 46% of the year's output in Antelope County.

MonthWind at 30 mOutputWorth
January7.11 m/s2,365 kWh$306
February7.03 m/s2,092 kWh$270
March7.15 m/s2,386 kWh$308
April7.40 m/s2,453 kWh$317
May6.79 m/s2,168 kWh$280
June6.22 m/s1,751 kWh$226
July5.55 m/s1,394 kWh$180
August5.54 m/s1,388 kWh$179
September6.73 m/s2,061 kWh$266
October7.01 m/s2,305 kWh$298
November7.08 m/s2,268 kWh$293
December6.98 m/s2,283 kWh$295

What a taller tower would buy

Measured at 10 m the wind in Antelope County averages 5.31 m/s; at 50 m it is 7.48 m/s. That gives a shear exponent of 0.213, typical of ordinary open country. Going from 20 m to 50 m takes output from 20,844 to 30,400 kWh a year, 46% more, before counting the extra cost of the taller tower. Why tower height decides it explains the shear behind these numbers.

Hub heightAverage windOutputPayback
20 m6.15 m/s20,844 kWh37 years
30 m6.71 m/s24,939 kWh31 years
40 m7.13 m/s27,987 kWh28 years
50 m7.48 m/s30,400 kWh26 years

Counties around Antelope County

1 of the 6 closest counties is windier at turbine height; the windiest, Wheeler County, averages 6.73 m/s.

Sun versus wind in Antelope County

Antelope County gets 4.26 kWh of sunshine per square metre a day on average. One kW of solar panels here would make roughly 1,244 kWh a year; one kW of the turbine above makes 2,495. This is one of the rare places where a kilowatt of turbine out-produces a kilowatt of panels, by 2.0 times. Panel output assumes an 80% system performance ratio. Wind or solar runs the same comparison for every county.

How this is worked out

Wind is NASA's Power climate record, the 2001-2025 average at 10 m and 50 m for the county's centre, carried to 30 m with this county's own measured wind shear and spread into hours with a Rayleigh distribution. The turbine is a generic 10 kW, 7 m rotor machine with 10% losses. Cost is $10,000 per kW installed with no tax credit, because the federal one ended in 2025. One county-centre number cannot see your hilltop or your tree line, so treat it as the starting point for a site survey, not a substitute. The full method and its weak spots are in how the numbers are made.