Wind Turbine Payback in Madison County, NE

Wind turbine payback in Madison County

No. The turbine wears out before it pays for itself.

At 30 m, the height a home turbine tower usually reaches, the wind in Madison County, NE averages 6.67 m/s (14.9 mph). A 10 kW turbine there would make about 24,655 kWh a year, worth $3,185 at NE's 12.92¢/kWh. Against an installed cost of about $100,000, that is a payback of 31 years, and the turbine is built to last about 20.

What to do in Madison County

A home turbine is not worth buying for savings in Madison County unless your spot is far windier than the county average, 8.8 m/s at the hub against 6.67 m/s here. Per kW, solar panels would make about 1,256 kWh a year here against the turbine's 2,466, so get a solar quote first.

What would have to change

Against the rest of NE

Madison County is the 82nd windiest of 3,144 US counties at turbine height; the national middle is 4.79 m/s. The windiest in NE is Cherry County at 6.83 m/s, payback 30 years.

Month by month in Madison County

April is the strongest month here, at 7.43 m/s and about 2,471 kWh. August is the weakest, 5.47 m/s and 1,343 kWh, so the best month makes 1.8 times the worst. November to March brings in 46% of the year's output in Madison County.

MonthWind at 30 mOutputWorth
January7.05 m/s2,325 kWh$300
February6.99 m/s2,070 kWh$267
March7.12 m/s2,368 kWh$306
April7.43 m/s2,471 kWh$319
May6.80 m/s2,171 kWh$280
June6.21 m/s1,749 kWh$226
July5.49 m/s1,354 kWh$175
August5.47 m/s1,343 kWh$174
September6.65 m/s2,015 kWh$260
October6.97 m/s2,276 kWh$294
November7.05 m/s2,250 kWh$291
December6.91 m/s2,243 kWh$290

What a taller tower would buy

Measured at 10 m the wind in Madison County averages 5.27 m/s; at 50 m it is 7.44 m/s. That gives a shear exponent of 0.214, typical of ordinary open country. Going from 20 m to 50 m takes output from 20,559 to 30,126 kWh a year, 47% more, before counting the extra cost of the taller tower. Why tower height decides it explains the shear behind these numbers.

Hub heightAverage windOutputPayback
20 m6.12 m/s20,559 kWh38 years
30 m6.67 m/s24,652 kWh31 years
40 m7.09 m/s27,706 kWh28 years
50 m7.44 m/s30,126 kWh26 years

Counties around Madison County

1 of the 6 closest counties is windier at turbine height; the windiest, Antelope County, averages 6.71 m/s.

Sun versus wind in Madison County

Madison County gets 4.3 kWh of sunshine per square metre a day on average. One kW of solar panels here would make roughly 1,256 kWh a year; one kW of the turbine above makes 2,466. This is one of the rare places where a kilowatt of turbine out-produces a kilowatt of panels, by 2.0 times. Panel output assumes an 80% system performance ratio. Wind or solar runs the same comparison for every county.

How this is worked out

Wind is NASA's Power climate record, the 2001-2025 average at 10 m and 50 m for the county's centre, carried to 30 m with this county's own measured wind shear and spread into hours with a Rayleigh distribution. The turbine is a generic 10 kW, 7 m rotor machine with 10% losses. Cost is $10,000 per kW installed with no tax credit, because the federal one ended in 2025. One county-centre number cannot see your hilltop or your tree line, so treat it as the starting point for a site survey, not a substitute. The full method and its weak spots are in how the numbers are made.