TurbinePayback

Wind Turbine Payback in Bannock County, ID

Wind turbine payback in Bannock County

No. The turbine wears out before it pays for itself.

At 30 m, the height a home turbine tower usually reaches, the wind in Bannock County, ID averages 4.31 m/s (9.6 mph). A 10 kW turbine there would make about 8,233 kWh a year, worth $1,072 at ID's 13.02¢/kWh. Against an installed cost of about $100,000, that is a payback of 93 years, and the turbine is built to last about 20.

What to do in Bannock County

A home turbine is not worth buying for savings in Bannock County unless your spot is far windier than the county average, 8.7 m/s at the hub against 4.31 m/s here. Per kW, solar panels would make about 1,326 kWh a year here against the turbine's 823, so get a solar quote first.

What would have to change

Against the rest of ID

Bannock County is the 1,893rd windiest of 3,144 US counties at turbine height; the national middle is 4.79 m/s. The windiest in ID is Owyhee County at 5.38 m/s, payback 51 years.

Month by month in Bannock County

March is the strongest month here, at 4.88 m/s and about 995 kWh. July is the weakest, 3.73 m/s and 449 kWh, so the best month makes 2.2 times the worst. November to March brings in 49% of the year's output in Bannock County.

MonthWind at 30 mOutputWorth
January4.42 m/s750 kWh$98
February4.59 m/s757 kWh$99
March4.88 m/s995 kWh$130
April4.72 m/s881 kWh$115
May4.23 m/s659 kWh$86
June4.23 m/s638 kWh$83
July3.73 m/s449 kWh$58
August3.77 m/s466 kWh$61
September3.94 m/s514 kWh$67
October4.23 m/s663 kWh$86
November4.46 m/s748 kWh$97
December4.51 m/s796 kWh$104

What a taller tower would buy

Measured at 10 m the wind in Bannock County averages 3.47 m/s; at 50 m it is 4.76 m/s. That gives a shear exponent of 0.196, typical of ordinary open country. Going from 20 m to 50 m takes output from 6,465 to 10,954 kWh a year, 69% more, before counting the extra cost of the taller tower. Why tower height decides it explains the shear behind these numbers.

Hub heightAverage windOutputPayback
20 m3.98 m/s6,465 kWhover 100 years
30 m4.31 m/s8,213 kWh94 years
40 m4.56 m/s9,679 kWh79 years
50 m4.76 m/s10,954 kWh70 years

Counties around Bannock County

2 of the 6 closest counties are windier at turbine height; the windiest, Bingham County, averages 4.82 m/s.

Sun versus wind in Bannock County

Bannock County gets 4.54 kWh of sunshine per square metre a day on average. One kW of solar panels here would make roughly 1,326 kWh a year; one kW of the turbine above makes 823. Kilowatt for kilowatt, panels make 1.6 times as much here as the turbine. Panel output assumes an 80% system performance ratio. Wind or solar runs the same comparison for every county.

How this is worked out

Wind is NASA's Power climate record, the 2001-2025 average at 10 m and 50 m for the county's centre, carried to 30 m with this county's own measured wind shear and spread into hours with a Rayleigh distribution. The turbine is a generic 10 kW, 7 m rotor machine with 10% losses. Cost is $10,000 per kW installed with no tax credit, because the federal one ended in 2025. One county-centre number cannot see your hilltop or your tree line, so treat it as the starting point for a site survey, not a substitute. The full method and its weak spots are in how the numbers are made.