TurbinePayback

Wind Turbine Payback in Franklin County, ID

Wind turbine payback in Franklin County

No. The turbine wears out before it pays for itself.

At 30 m, the height a home turbine tower usually reaches, the wind in Franklin County, ID averages 3.67 m/s (8.2 mph). A 10 kW turbine there would make about 5,034 kWh a year, worth $655 at ID's 13.02¢/kWh. Against an installed cost of about $100,000, that is a payback of over 100 years, and the turbine is built to last about 20.

What to do in Franklin County

A home turbine is not worth buying for savings in Franklin County unless your spot is far windier than the county average, 8.7 m/s at the hub against 3.67 m/s here. Per kW, solar panels would make about 1,326 kWh a year here against the turbine's 503, so get a solar quote first.

What would have to change

Against the rest of ID

Franklin County is the 2,308th windiest of 3,144 US counties at turbine height; the national middle is 4.79 m/s. The windiest in ID is Owyhee County at 5.38 m/s, payback 51 years.

Month by month in Franklin County

March is the strongest month here, at 4.05 m/s and about 578 kWh. July is the weakest, 3.35 m/s and 320 kWh, so the best month makes 1.8 times the worst. November to March brings in 44% of the year's output in Franklin County.

MonthWind at 30 mOutputWorth
January3.60 m/s401 kWh$52
February3.86 m/s451 kWh$59
March4.05 m/s578 kWh$75
April4.04 m/s556 kWh$72
May3.71 m/s443 kWh$58
June3.78 m/s456 kWh$59
July3.35 m/s320 kWh$42
August3.38 m/s328 kWh$43
September3.51 m/s360 kWh$47
October3.51 m/s372 kWh$48
November3.64 m/s403 kWh$52
December3.65 m/s420 kWh$55

What a taller tower would buy

Measured at 10 m the wind in Franklin County averages 2.93 m/s; at 50 m it is 4.07 m/s. That gives a shear exponent of 0.204, typical of ordinary open country. Going from 20 m to 50 m takes output from 3,853 to 6,934 kWh a year, 80% more, before counting the extra cost of the taller tower. Why tower height decides it explains the shear behind these numbers.

Hub heightAverage windOutputPayback
20 m3.38 m/s3,853 kWhover 100 years
30 m3.67 m/s5,022 kWhover 100 years
40 m3.89 m/s6,032 kWhover 100 years
50 m4.07 m/s6,934 kWhover 100 years

Counties around Franklin County

3 of the 6 closest counties are windier at turbine height; the windiest, Rich County, averages 4.61 m/s.

Sun versus wind in Franklin County

Franklin County gets 4.54 kWh of sunshine per square metre a day on average. One kW of solar panels here would make roughly 1,326 kWh a year; one kW of the turbine above makes 503. Kilowatt for kilowatt, panels make 2.6 times as much here as the turbine. Panel output assumes an 80% system performance ratio. Wind or solar runs the same comparison for every county.

How this is worked out

Wind is NASA's Power climate record, the 2001-2025 average at 10 m and 50 m for the county's centre, carried to 30 m with this county's own measured wind shear and spread into hours with a Rayleigh distribution. The turbine is a generic 10 kW, 7 m rotor machine with 10% losses. Cost is $10,000 per kW installed with no tax credit, because the federal one ended in 2025. One county-centre number cannot see your hilltop or your tree line, so treat it as the starting point for a site survey, not a substitute. The full method and its weak spots are in how the numbers are made.