Wind turbine payback in Barber County

No. The turbine wears out before it pays for itself.

At 30 m, the height a home turbine tower usually reaches, the wind in Barber County, KS averages 6.3 m/s (14.1 mph). A 10 kW turbine there would make about 21,929 kWh a year, worth $3,346 at KS's 15.26¢/kWh. Against an installed cost of about $100,000, that is a payback of 30 years, and the turbine is built to last about 20.

What to do in Barber County

A home turbine is not worth buying for savings in Barber County unless your spot is far windier than the county average, 7.8 m/s at the hub against 6.3 m/s here. Per kW, solar panels would make about 1,387 kWh a year here against the turbine's 2,193, so get a solar quote first.

What would have to change

Against the rest of KS

Barber County is the 474th windiest of 3,144 US counties at turbine height; the national middle is 4.79 m/s. The windiest in KS is Edwards County at 6.68 m/s, payback 27 years.

Month by month in Barber County

April is the strongest month here, at 7.17 m/s and about 2,320 kWh. August is the weakest, 5.60 m/s and 1,425 kWh, so the best month makes 1.6 times the worst. November to March brings in 41% of the year's output in Barber County.

MonthWind at 30 mOutputWorth
January6.08 m/s1,725 kWh$263
February6.15 m/s1,599 kWh$244
March6.70 m/s2,115 kWh$323
April7.17 m/s2,320 kWh$354
May6.50 m/s1,988 kWh$303
June6.48 m/s1,913 kWh$292
July5.73 m/s1,502 kWh$229
August5.60 m/s1,425 kWh$217
September6.19 m/s1,734 kWh$265
October6.46 m/s1,960 kWh$299
November6.46 m/s1,902 kWh$290
December6.06 m/s1,708 kWh$261

What a taller tower would buy

Measured at 10 m the wind in Barber County averages 4.89 m/s; at 50 m it is 7.08 m/s. That gives a shear exponent of 0.230, typical of ordinary open country. Going from 20 m to 50 m takes output from 17,746 to 27,613 kWh a year, 56% more, before counting the extra cost of the taller tower. Why tower height decides it explains the shear behind these numbers.

Hub heightAverage windOutputPayback
20 m5.73 m/s17,746 kWh37 years
30 m6.3 m/s21,893 kWh30 years
40 m6.73 m/s25,062 kWh26 years
50 m7.08 m/s27,613 kWh24 years

Counties around Barber County

5 of the 6 closest counties are windier at turbine height; the windiest, Pratt County, averages 6.53 m/s.

Sun versus wind in Barber County

Barber County gets 4.75 kWh of sunshine per square metre a day on average. One kW of solar panels here would make roughly 1,387 kWh a year; one kW of the turbine above makes 2,193. This is one of the rare places where a kilowatt of turbine out-produces a kilowatt of panels, by 1.6 times. Panel output assumes an 80% system performance ratio. Wind or solar runs the same comparison for every county.

How this is worked out

Wind is NASA's Power climate record, the 2001-2025 average at 10 m and 50 m for the county's centre, carried to 30 m with this county's own measured wind shear and spread into hours with a Rayleigh distribution. The turbine is a generic 10 kW, 7 m rotor machine with 10% losses. Cost is $10,000 per kW installed with no tax credit, because the federal one ended in 2025. One county-centre number cannot see your hilltop or your tree line, so treat it as the starting point for a site survey, not a substitute. The full method and its weak spots are in how the numbers are made.