No. The turbine wears out before it pays for itself.

At 30 m, the height a home turbine tower usually reaches, the wind in Kingman County, KS averages 6.45 m/s (14.4 mph). A 10 kW turbine there would make about 23,038 kWh a year, worth $3,516 at KS's 15.26¢/kWh. Against an installed cost of about $100,000, that is a payback of 28 years, and the turbine is built to last about 20.

What to do in Kingman County

A home turbine is not worth buying for savings in Kingman County unless your spot is far windier than the county average, 7.8 m/s at the hub against 6.45 m/s here. Per kW, solar panels would make about 1,387 kWh a year here against the turbine's 2,304, so get a solar quote first.

What would have to change

Against the rest of KS

Kingman County is the 257th windiest of 3,144 US counties at turbine height; the national middle is 4.79 m/s. The windiest in KS is Edwards County at 6.68 m/s, payback 27 years.

Month by month in Kingman County

April is the strongest month here, at 7.35 m/s and about 2,425 kWh. August is the weakest, 5.62 m/s and 1,435 kWh, so the best month makes 1.7 times the worst. November to March brings in 42% of the year's output in Kingman County.

MonthWind at 30 mOutputWorth
January6.31 m/s1,872 kWh$286
February6.36 m/s1,716 kWh$262
March6.87 m/s2,216 kWh$338
April7.35 m/s2,425 kWh$370
May6.56 m/s2,028 kWh$309
June6.57 m/s1,968 kWh$300
July5.76 m/s1,524 kWh$233
August5.62 m/s1,435 kWh$219
September6.32 m/s1,817 kWh$277
October6.69 m/s2,106 kWh$321
November6.71 m/s2,049 kWh$313
December6.29 m/s1,855 kWh$283

What a taller tower would buy

Measured at 10 m the wind in Kingman County averages 5.04 m/s; at 50 m it is 7.23 m/s. That gives a shear exponent of 0.224, typical of ordinary open country. Going from 20 m to 50 m takes output from 18,879 to 28,671 kWh a year, 52% more, before counting the extra cost of the taller tower. Why tower height decides it explains the shear behind these numbers.

Hub heightAverage windOutputPayback
20 m5.89 m/s18,879 kWh35 years
30 m6.45 m/s23,026 kWh29 years
40 m6.88 m/s26,163 kWh25 years
50 m7.23 m/s28,671 kWh23 years

Counties around Kingman County

2 of the 6 closest counties are windier at turbine height; the windiest, Reno County, averages 6.59 m/s.

Sun versus wind in Kingman County

Kingman County gets 4.75 kWh of sunshine per square metre a day on average. One kW of solar panels here would make roughly 1,387 kWh a year; one kW of the turbine above makes 2,304. This is one of the rare places where a kilowatt of turbine out-produces a kilowatt of panels, by 1.7 times. Panel output assumes an 80% system performance ratio. Wind or solar runs the same comparison for every county.

How this is worked out

Wind is NASA's Power climate record, the 2001-2025 average at 10 m and 50 m for the county's centre, carried to 30 m with this county's own measured wind shear and spread into hours with a Rayleigh distribution. The turbine is a generic 10 kW, 7 m rotor machine with 10% losses. Cost is $10,000 per kW installed with no tax credit, because the federal one ended in 2025. One county-centre number cannot see your hilltop or your tree line, so treat it as the starting point for a site survey, not a substitute. The full method and its weak spots are in how the numbers are made.