TurbinePayback

Wind Turbine Payback in Beaver County, OK

Wind turbine payback in Beaver County

No. The turbine wears out before it pays for itself.

At 30 m, the height a home turbine tower usually reaches, the wind in Beaver County, OK averages 6.72 m/s (15 mph). A 10 kW turbine there would make about 25,020 kWh a year, worth $3,455 at OK's 13.81¢/kWh. Against an installed cost of about $100,000, that is a payback of 29 years, and the turbine is built to last about 20.

What to do in Beaver County

A home turbine is not worth buying for savings in Beaver County unless your spot is far windier than the county average, 8.4 m/s at the hub against 6.72 m/s here. Per kW, solar panels would make about 1,478 kWh a year here against the turbine's 2,502, so get a solar quote first.

What would have to change

Against the rest of OK

Beaver County is the 56th windiest of 3,144 US counties at turbine height; the national middle is 4.79 m/s. The windiest in OK is Cimarron County at 6.82 m/s, payback 28 years.

Month by month in Beaver County

April is the strongest month here, at 7.57 m/s and about 2,548 kWh. August is the weakest, 5.96 m/s and 1,649 kWh, so the best month makes 1.5 times the worst. November to March brings in 41% of the year's output in Beaver County.

MonthWind at 30 mOutputWorth
January6.45 m/s1,954 kWh$270
February6.63 m/s1,872 kWh$259
March7.08 m/s2,348 kWh$324
April7.57 m/s2,548 kWh$352
May6.91 m/s2,244 kWh$310
June7.04 m/s2,246 kWh$310
July6.18 m/s1,785 kWh$247
August5.96 m/s1,649 kWh$228
September6.66 m/s2,022 kWh$279
October6.76 m/s2,150 kWh$297
November6.83 m/s2,124 kWh$293
December6.51 m/s1,994 kWh$275

What a taller tower would buy

Measured at 10 m the wind in Beaver County averages 5.33 m/s; at 50 m it is 7.48 m/s. That gives a shear exponent of 0.211, typical of ordinary open country. Going from 20 m to 50 m takes output from 20,928 to 30,400 kWh a year, 45% more, before counting the extra cost of the taller tower. Why tower height decides it explains the shear behind these numbers.

Hub heightAverage windOutputPayback
20 m6.17 m/s20,928 kWh35 years
30 m6.72 m/s24,989 kWh29 years
40 m7.14 m/s28,010 kWh26 years
50 m7.48 m/s30,400 kWh24 years

Counties around Beaver County

1 of the 6 closest counties is windier at turbine height; the windiest, Lipscomb County, averages 6.78 m/s.

Sun versus wind in Beaver County

Beaver County gets 5.06 kWh of sunshine per square metre a day on average. One kW of solar panels here would make roughly 1,478 kWh a year; one kW of the turbine above makes 2,502. This is one of the rare places where a kilowatt of turbine out-produces a kilowatt of panels, by 1.7 times. Panel output assumes an 80% system performance ratio. Wind or solar runs the same comparison for every county.

How this is worked out

Wind is NASA's Power climate record, the 2001-2025 average at 10 m and 50 m for the county's centre, carried to 30 m with this county's own measured wind shear and spread into hours with a Rayleigh distribution. The turbine is a generic 10 kW, 7 m rotor machine with 10% losses. Cost is $10,000 per kW installed with no tax credit, because the federal one ended in 2025. One county-centre number cannot see your hilltop or your tree line, so treat it as the starting point for a site survey, not a substitute. The full method and its weak spots are in how the numbers are made.