TurbinePayback

Wind Turbine Payback in Belknap County, NH

Wind turbine payback in Belknap County

No. The turbine wears out before it pays for itself.

At 30 m, the height a home turbine tower usually reaches, the wind in Belknap County, NH averages 3.58 m/s (8 mph). A 10 kW turbine there would make about 4,653 kWh a year, worth $1,252 at NH's 26.91¢/kWh. Against an installed cost of about $100,000, that is a payback of 80 years, and the turbine is built to last about 20.

What to do in Belknap County

A home turbine is not worth buying for savings in Belknap County unless your spot is far windier than the county average, 5.8 m/s at the hub against 3.58 m/s here. Per kW, solar panels would make about 1,083 kWh a year here against the turbine's 465, so get a solar quote first.

What would have to change

Against the rest of NH

Belknap County is the 2,429th windiest of 3,144 US counties at turbine height; the national middle is 4.79 m/s. The windiest in NH is Cheshire County at 3.64 m/s, payback 76 years.

Month by month in Belknap County

March is the strongest month here, at 4.31 m/s and about 700 kWh. August is the weakest, 2.86 m/s and 188 kWh, so the best month makes 3.7 times the worst. November to March brings in 59% of the year's output in Belknap County.

MonthWind at 30 mOutputWorth
January4.15 m/s625 kWh$168
February4.40 m/s672 kWh$181
March4.31 m/s700 kWh$188
April3.95 m/s519 kWh$140
May3.32 m/s311 kWh$84
June3.01 m/s216 kWh$58
July2.87 m/s189 kWh$51
August2.86 m/s188 kWh$51
September3.09 m/s236 kWh$64
October3.52 m/s374 kWh$101
November3.66 m/s412 kWh$111
December3.87 m/s503 kWh$135

What a taller tower would buy

Measured at 10 m the wind in Belknap County averages 2.28 m/s; at 50 m it is 4.42 m/s. That gives a shear exponent of 0.411, typical of rough, sheltered ground: trees or buildings slow the low wind a lot. Going from 20 m to 50 m takes output from 2,700 to 8,865 kWh a year, 228% more, before counting the extra cost of the taller tower. Why tower height decides it explains the shear behind these numbers.

Hub heightAverage windOutputPayback
20 m3.03 m/s2,700 kWhover 100 years
30 m3.58 m/s4,665 kWh80 years
40 m4.03 m/s6,743 kWh55 years
50 m4.42 m/s8,865 kWh42 years

Counties around Belknap County

1 of the 6 closest counties is windier at turbine height; the windiest, York County, averages 3.93 m/s.

Sun versus wind in Belknap County

Belknap County gets 3.71 kWh of sunshine per square metre a day on average. One kW of solar panels here would make roughly 1,083 kWh a year; one kW of the turbine above makes 465. Kilowatt for kilowatt, panels make 2.3 times as much here as the turbine. Panel output assumes an 80% system performance ratio. Wind or solar runs the same comparison for every county.

How this is worked out

Wind is NASA's Power climate record, the 2001-2025 average at 10 m and 50 m for the county's centre, carried to 30 m with this county's own measured wind shear and spread into hours with a Rayleigh distribution. The turbine is a generic 10 kW, 7 m rotor machine with 10% losses. Cost is $10,000 per kW installed with no tax credit, because the federal one ended in 2025. One county-centre number cannot see your hilltop or your tree line, so treat it as the starting point for a site survey, not a substitute. The full method and its weak spots are in how the numbers are made.