No. The turbine wears out before it pays for itself.
At 30 m, the height a home turbine tower usually reaches, the wind in Bon Homme County, SD averages 6.45 m/s (14.4 mph). A 10 kW turbine there would make about 23,038 kWh a year, worth $3,359 at SD's 14.58¢/kWh. Against an installed cost of about $100,000, that is a payback of 30 years, and the turbine is built to last about 20.
What to do in Bon Homme County
A home turbine is not worth buying for savings in Bon Homme County unless your spot is far windier than the county average, 8.1 m/s at the hub against 6.45 m/s here. Per kW, solar panels would make about 1,226 kWh a year here against the turbine's 2,304, so get a solar quote first.
What would have to change
- Power would have to cost 22¢/kWh, 1.5 times what SD pays now.
- Or the average wind at the hub would have to be 8.1 m/s instead of 6.45. A taller tower or an exposed ridge can add some of that; a rooftop never will.
Against the rest of SD
Bon Homme County is the 257th windiest of 3,144 US counties at turbine height; the national middle is 4.79 m/s. The windiest in SD is Todd County at 6.77 m/s, payback 27 years.
Month by month in Bon Homme County
April is the strongest month here, at 7.08 m/s and about 2,269 kWh. July is the weakest, 5.51 m/s and 1,368 kWh, so the best month makes 1.7 times the worst. November to March brings in 44% of the year's output in Bon Homme County.
| Month | Wind at 30 m | Output | Worth |
|---|---|---|---|
| January | 6.66 m/s | 2,086 kWh | $304 |
| February | 6.57 m/s | 1,834 kWh | $267 |
| March | 6.82 m/s | 2,186 kWh | $319 |
| April | 7.08 m/s | 2,269 kWh | $331 |
| May | 6.65 m/s | 2,080 kWh | $303 |
| June | 6.04 m/s | 1,643 kWh | $240 |
| July | 5.51 m/s | 1,368 kWh | $199 |
| August | 5.55 m/s | 1,390 kWh | $203 |
| September | 6.58 m/s | 1,970 kWh | $287 |
| October | 6.78 m/s | 2,164 kWh | $316 |
| November | 6.70 m/s | 2,046 kWh | $298 |
| December | 6.51 m/s | 1,997 kWh | $291 |
What a taller tower would buy
Measured at 10 m the wind in Bon Homme County averages 5.09 m/s; at 50 m it is 7.2 m/s. That gives a shear exponent of 0.215, typical of ordinary open country. Going from 20 m to 50 m takes output from 19,057 to 28,461 kWh a year, 49% more, before counting the extra cost of the taller tower. Why tower height decides it explains the shear behind these numbers.
| Hub height | Average wind | Output | Payback |
|---|---|---|---|
| 20 m | 5.91 m/s | 19,057 kWh | 36 years |
| 30 m | 6.45 m/s | 23,047 kWh | 30 years |
| 40 m | 6.86 m/s | 26,056 kWh | 26 years |
| 50 m | 7.2 m/s | 28,461 kWh | 24 years |
Counties around Bon Homme County
4 of the 6 closest counties are windier at turbine height; the windiest, Cedar County, averages 6.66 m/s.
- Knox County, NE: 6.62 m/s, 24,289 kWh, payback 32 years (24 mi)
- Yankton County, SD: 6.47 m/s, 23,186 kWh, payback 30 years (25 mi)
- Hutchinson County, SD: 6.45 m/s, 23,038 kWh, payback 30 years (25 mi)
- Douglas County, SD: 6.4 m/s, 22,669 kWh, payback 30 years (37 mi)
- Charles Mix County, SD: 6.52 m/s, 23,554 kWh, payback 29 years (39 mi)
- Cedar County, NE: 6.66 m/s, 24,582 kWh, payback 32 years (41 mi)
Sun versus wind in Bon Homme County
Bon Homme County gets 4.2 kWh of sunshine per square metre a day on average. One kW of solar panels here would make roughly 1,226 kWh a year; one kW of the turbine above makes 2,304. This is one of the rare places where a kilowatt of turbine out-produces a kilowatt of panels, by 1.9 times. Panel output assumes an 80% system performance ratio. Wind or solar runs the same comparison for every county.
How this is worked out
Wind is NASA's Power climate record, the 2001-2025 average at 10 m and 50 m for the county's centre, carried to 30 m with this county's own measured wind shear and spread into hours with a Rayleigh distribution. The turbine is a generic 10 kW, 7 m rotor machine with 10% losses. Cost is $10,000 per kW installed with no tax credit, because the federal one ended in 2025. One county-centre number cannot see your hilltop or your tree line, so treat it as the starting point for a site survey, not a substitute. The full method and its weak spots are in how the numbers are made.