TurbinePayback

Wind Turbine Payback in Bon Homme County, SD

Wind turbine payback in Bon Homme County

No. The turbine wears out before it pays for itself.

At 30 m, the height a home turbine tower usually reaches, the wind in Bon Homme County, SD averages 6.45 m/s (14.4 mph). A 10 kW turbine there would make about 23,038 kWh a year, worth $3,359 at SD's 14.58¢/kWh. Against an installed cost of about $100,000, that is a payback of 30 years, and the turbine is built to last about 20.

What to do in Bon Homme County

A home turbine is not worth buying for savings in Bon Homme County unless your spot is far windier than the county average, 8.1 m/s at the hub against 6.45 m/s here. Per kW, solar panels would make about 1,226 kWh a year here against the turbine's 2,304, so get a solar quote first.

What would have to change

Against the rest of SD

Bon Homme County is the 257th windiest of 3,144 US counties at turbine height; the national middle is 4.79 m/s. The windiest in SD is Todd County at 6.77 m/s, payback 27 years.

Month by month in Bon Homme County

April is the strongest month here, at 7.08 m/s and about 2,269 kWh. July is the weakest, 5.51 m/s and 1,368 kWh, so the best month makes 1.7 times the worst. November to March brings in 44% of the year's output in Bon Homme County.

MonthWind at 30 mOutputWorth
January6.66 m/s2,086 kWh$304
February6.57 m/s1,834 kWh$267
March6.82 m/s2,186 kWh$319
April7.08 m/s2,269 kWh$331
May6.65 m/s2,080 kWh$303
June6.04 m/s1,643 kWh$240
July5.51 m/s1,368 kWh$199
August5.55 m/s1,390 kWh$203
September6.58 m/s1,970 kWh$287
October6.78 m/s2,164 kWh$316
November6.70 m/s2,046 kWh$298
December6.51 m/s1,997 kWh$291

What a taller tower would buy

Measured at 10 m the wind in Bon Homme County averages 5.09 m/s; at 50 m it is 7.2 m/s. That gives a shear exponent of 0.215, typical of ordinary open country. Going from 20 m to 50 m takes output from 19,057 to 28,461 kWh a year, 49% more, before counting the extra cost of the taller tower. Why tower height decides it explains the shear behind these numbers.

Hub heightAverage windOutputPayback
20 m5.91 m/s19,057 kWh36 years
30 m6.45 m/s23,047 kWh30 years
40 m6.86 m/s26,056 kWh26 years
50 m7.2 m/s28,461 kWh24 years

Counties around Bon Homme County

4 of the 6 closest counties are windier at turbine height; the windiest, Cedar County, averages 6.66 m/s.

Sun versus wind in Bon Homme County

Bon Homme County gets 4.2 kWh of sunshine per square metre a day on average. One kW of solar panels here would make roughly 1,226 kWh a year; one kW of the turbine above makes 2,304. This is one of the rare places where a kilowatt of turbine out-produces a kilowatt of panels, by 1.9 times. Panel output assumes an 80% system performance ratio. Wind or solar runs the same comparison for every county.

How this is worked out

Wind is NASA's Power climate record, the 2001-2025 average at 10 m and 50 m for the county's centre, carried to 30 m with this county's own measured wind shear and spread into hours with a Rayleigh distribution. The turbine is a generic 10 kW, 7 m rotor machine with 10% losses. Cost is $10,000 per kW installed with no tax credit, because the federal one ended in 2025. One county-centre number cannot see your hilltop or your tree line, so treat it as the starting point for a site survey, not a substitute. The full method and its weak spots are in how the numbers are made.