Wind turbine payback in Douglas County

No. The turbine wears out before it pays for itself.

At 30 m, the height a home turbine tower usually reaches, the wind in Douglas County, SD averages 6.4 m/s (14.3 mph). A 10 kW turbine there would make about 22,669 kWh a year, worth $3,305 at SD's 14.58¢/kWh. Against an installed cost of about $100,000, that is a payback of 30 years, and the turbine is built to last about 20.

What to do in Douglas County

A home turbine is not worth buying for savings in Douglas County unless your spot is far windier than the county average, 8.1 m/s at the hub against 6.4 m/s here. Per kW, solar panels would make about 1,221 kWh a year here against the turbine's 2,267, so get a solar quote first.

What would have to change

Against the rest of SD

Douglas County is the 322nd windiest of 3,144 US counties at turbine height; the national middle is 4.79 m/s. The windiest in SD is Todd County at 6.77 m/s, payback 27 years.

Month by month in Douglas County

April is the strongest month here, at 7.05 m/s and about 2,251 kWh. July is the weakest, 5.53 m/s and 1,383 kWh, so the best month makes 1.6 times the worst. November to March brings in 43% of the year's output in Douglas County.

MonthWind at 30 mOutputWorth
January6.52 m/s2,000 kWh$292
February6.46 m/s1,771 kWh$258
March6.76 m/s2,151 kWh$314
April7.05 m/s2,251 kWh$328
May6.65 m/s2,084 kWh$304
June6.05 m/s1,652 kWh$241
July5.53 m/s1,383 kWh$202
August5.60 m/s1,422 kWh$207
September6.55 m/s1,952 kWh$285
October6.77 m/s2,156 kWh$314
November6.60 m/s1,984 kWh$289
December6.38 m/s1,910 kWh$278

What a taller tower would buy

Measured at 10 m the wind in Douglas County averages 5.05 m/s; at 50 m it is 7.15 m/s. That gives a shear exponent of 0.216, typical of ordinary open country. Going from 20 m to 50 m takes output from 18,714 to 28,109 kWh a year, 50% more, before counting the extra cost of the taller tower. Why tower height decides it explains the shear behind these numbers.

Hub heightAverage windOutputPayback
20 m5.87 m/s18,714 kWh37 years
30 m6.4 m/s22,691 kWh30 years
40 m6.81 m/s25,700 kWh27 years
50 m7.15 m/s28,109 kWh24 years

Counties around Douglas County

5 of the 6 closest counties are windier at turbine height; the windiest, Charles Mix County, averages 6.52 m/s.

Sun versus wind in Douglas County

Douglas County gets 4.18 kWh of sunshine per square metre a day on average. One kW of solar panels here would make roughly 1,221 kWh a year; one kW of the turbine above makes 2,267. This is one of the rare places where a kilowatt of turbine out-produces a kilowatt of panels, by 1.9 times. Panel output assumes an 80% system performance ratio. Wind or solar runs the same comparison for every county.

How this is worked out

Wind is NASA's Power climate record, the 2001-2025 average at 10 m and 50 m for the county's centre, carried to 30 m with this county's own measured wind shear and spread into hours with a Rayleigh distribution. The turbine is a generic 10 kW, 7 m rotor machine with 10% losses. Cost is $10,000 per kW installed with no tax credit, because the federal one ended in 2025. One county-centre number cannot see your hilltop or your tree line, so treat it as the starting point for a site survey, not a substitute. The full method and its weak spots are in how the numbers are made.