Wind turbine payback in Box Butte County

No. The turbine wears out before it pays for itself.

At 30 m, the height a home turbine tower usually reaches, the wind in Box Butte County, NE averages 6.38 m/s (14.3 mph). A 10 kW turbine there would make about 22,521 kWh a year, worth $2,910 at NE's 12.92¢/kWh. Against an installed cost of about $100,000, that is a payback of 34 years, and the turbine is built to last about 20.

What to do in Box Butte County

A home turbine is not worth buying for savings in Box Butte County unless your spot is far windier than the county average, 8.8 m/s at the hub against 6.38 m/s here. Per kW, solar panels would make about 1,317 kWh a year here against the turbine's 2,252, so get a solar quote first.

What would have to change

Against the rest of NE

Box Butte County is the 359th windiest of 3,144 US counties at turbine height; the national middle is 4.79 m/s. The windiest in NE is Cherry County at 6.83 m/s, payback 30 years.

Month by month in Box Butte County

January is the strongest month here, at 7.14 m/s and about 2,383 kWh. July is the weakest, 5.37 m/s and 1,280 kWh, so the best month makes 1.9 times the worst. November to March brings in 49% of the year's output in Box Butte County.

MonthWind at 30 mOutputWorth
January7.14 m/s2,383 kWh$308
February6.89 m/s2,015 kWh$260
March6.84 m/s2,198 kWh$284
April6.82 m/s2,117 kWh$274
May6.15 m/s1,769 kWh$229
June5.75 m/s1,468 kWh$190
July5.37 m/s1,280 kWh$165
August5.41 m/s1,307 kWh$169
September5.90 m/s1,560 kWh$202
October6.55 m/s2,021 kWh$261
November6.83 m/s2,122 kWh$274
December7.02 m/s2,307 kWh$298

What a taller tower would buy

Measured at 10 m the wind in Box Butte County averages 5 m/s; at 50 m it is 7.15 m/s. That gives a shear exponent of 0.222, typical of ordinary open country. Going from 20 m to 50 m takes output from 18,476 to 28,109 kWh a year, 52% more, before counting the extra cost of the taller tower. Why tower height decides it explains the shear behind these numbers.

Hub heightAverage windOutputPayback
20 m5.83 m/s18,476 kWh42 years
30 m6.38 m/s22,547 kWh34 years
40 m6.8 m/s25,634 kWh30 years
50 m7.15 m/s28,109 kWh28 years

Counties around Box Butte County

3 of the 6 closest counties are windier at turbine height; the windiest, Sheridan County, averages 6.61 m/s.

Sun versus wind in Box Butte County

Box Butte County gets 4.51 kWh of sunshine per square metre a day on average. One kW of solar panels here would make roughly 1,317 kWh a year; one kW of the turbine above makes 2,252. This is one of the rare places where a kilowatt of turbine out-produces a kilowatt of panels, by 1.7 times. Panel output assumes an 80% system performance ratio. Wind or solar runs the same comparison for every county.

How this is worked out

Wind is NASA's Power climate record, the 2001-2025 average at 10 m and 50 m for the county's centre, carried to 30 m with this county's own measured wind shear and spread into hours with a Rayleigh distribution. The turbine is a generic 10 kW, 7 m rotor machine with 10% losses. Cost is $10,000 per kW installed with no tax credit, because the federal one ended in 2025. One county-centre number cannot see your hilltop or your tree line, so treat it as the starting point for a site survey, not a substitute. The full method and its weak spots are in how the numbers are made.