TurbinePayback

Wind Turbine Payback in Garden County, NE

Wind turbine payback in Garden County

No. The turbine wears out before it pays for itself.

At 30 m, the height a home turbine tower usually reaches, the wind in Garden County, NE averages 6.34 m/s (14.2 mph). A 10 kW turbine there would make about 22,225 kWh a year, worth $2,871 at NE's 12.92¢/kWh. Against an installed cost of about $100,000, that is a payback of 35 years, and the turbine is built to last about 20.

What to do in Garden County

A home turbine is not worth buying for savings in Garden County unless your spot is far windier than the county average, 8.8 m/s at the hub against 6.34 m/s here. Per kW, solar panels would make about 1,364 kWh a year here against the turbine's 2,223, so get a solar quote first.

What would have to change

Against the rest of NE

Garden County is the 420th windiest of 3,144 US counties at turbine height; the national middle is 4.79 m/s. The windiest in NE is Cherry County at 6.83 m/s, payback 30 years.

Month by month in Garden County

January is the strongest month here, at 6.94 m/s and about 2,258 kWh. July is the weakest, 5.36 m/s and 1,275 kWh, so the best month makes 1.8 times the worst. November to March brings in 48% of the year's output in Garden County.

MonthWind at 30 mOutputWorth
January6.94 m/s2,258 kWh$292
February6.78 m/s1,951 kWh$252
March6.80 m/s2,176 kWh$281
April6.90 m/s2,164 kWh$280
May6.21 m/s1,808 kWh$234
June5.78 m/s1,484 kWh$192
July5.36 m/s1,275 kWh$165
August5.40 m/s1,302 kWh$168
September5.93 m/s1,576 kWh$204
October6.54 m/s2,016 kWh$260
November6.67 m/s2,026 kWh$262
December6.81 m/s2,182 kWh$282

What a taller tower would buy

Measured at 10 m the wind in Garden County averages 4.97 m/s; at 50 m it is 7.1 m/s. That gives a shear exponent of 0.222, typical of ordinary open country. Going from 20 m to 50 m takes output from 18,176 to 27,755 kWh a year, 53% more, before counting the extra cost of the taller tower. Why tower height decides it explains the shear behind these numbers.

Hub heightAverage windOutputPayback
20 m5.79 m/s18,176 kWh43 years
30 m6.34 m/s22,216 kWh35 years
40 m6.76 m/s25,289 kWh31 years
50 m7.1 m/s27,755 kWh28 years

Counties around Garden County

2 of the 6 closest counties are windier at turbine height; the windiest, Grant County, averages 6.73 m/s.

Sun versus wind in Garden County

Garden County gets 4.67 kWh of sunshine per square metre a day on average. One kW of solar panels here would make roughly 1,364 kWh a year; one kW of the turbine above makes 2,223. This is one of the rare places where a kilowatt of turbine out-produces a kilowatt of panels, by 1.6 times. Panel output assumes an 80% system performance ratio. Wind or solar runs the same comparison for every county.

How this is worked out

Wind is NASA's Power climate record, the 2001-2025 average at 10 m and 50 m for the county's centre, carried to 30 m with this county's own measured wind shear and spread into hours with a Rayleigh distribution. The turbine is a generic 10 kW, 7 m rotor machine with 10% losses. Cost is $10,000 per kW installed with no tax credit, because the federal one ended in 2025. One county-centre number cannot see your hilltop or your tree line, so treat it as the starting point for a site survey, not a substitute. The full method and its weak spots are in how the numbers are made.