Wind Turbine Payback in Box Elder County, UT

Wind turbine payback in Box Elder County

No. The turbine wears out before it pays for itself.

At 30 m, the height a home turbine tower usually reaches, the wind in Box Elder County, UT averages 4.17 m/s (9.3 mph). A 10 kW turbine there would make about 7,461 kWh a year, worth $984 at UT's 13.19¢/kWh. Against an installed cost of about $100,000, that is a payback of over 100 years, and the turbine is built to last about 20.

What to do in Box Elder County

A home turbine is not worth buying for savings in Box Elder County unless your spot is far windier than the county average, 8.7 m/s at the hub against 4.17 m/s here. Per kW, solar panels would make about 1,291 kWh a year here against the turbine's 746, so get a solar quote first.

What would have to change

Against the rest of UT

Box Elder County is the 1,965th windiest of 3,144 US counties at turbine height; the national middle is 4.79 m/s. The windiest in UT is Daggett County at 5.32 m/s, payback 51 years.

Month by month in Box Elder County

April is the strongest month here, at 4.97 m/s and about 1,011 kWh. January is the weakest, 3.50 m/s and 368 kWh, so the best month makes 2.7 times the worst. November to March brings in 38% of the year's output in Box Elder County.

MonthWind at 30 mOutputWorth
January3.50 m/s368 kWh$49
February4.36 m/s656 kWh$87
March4.77 m/s938 kWh$124
April4.97 m/s1,011 kWh$133
May4.51 m/s798 kWh$105
June4.46 m/s750 kWh$99
July3.95 m/s536 kWh$71
August3.96 m/s540 kWh$71
September3.96 m/s522 kWh$69
October4.02 m/s567 kWh$75
November3.84 m/s476 kWh$63
December3.86 m/s503 kWh$66

What a taller tower would buy

Measured at 10 m the wind in Box Elder County averages 3.4 m/s; at 50 m it is 4.59 m/s. That gives a shear exponent of 0.186, typical of ordinary open country. Going from 20 m to 50 m takes output from 5,945 to 9,885 kWh a year, 66% more, before counting the extra cost of the taller tower. Why tower height decides it explains the shear behind these numbers.

Hub heightAverage windOutputPayback
20 m3.87 m/s5,945 kWhover 100 years
30 m4.17 m/s7,483 kWhover 100 years
40 m4.4 m/s8,768 kWh87 years
50 m4.59 m/s9,885 kWh77 years

Counties around Box Elder County

1 of the 6 closest counties is windier at turbine height; the windiest, Cassia County, averages 4.98 m/s.

Sun versus wind in Box Elder County

Box Elder County gets 4.42 kWh of sunshine per square metre a day on average. One kW of solar panels here would make roughly 1,291 kWh a year; one kW of the turbine above makes 746. Kilowatt for kilowatt, panels make 1.7 times as much here as the turbine. Panel output assumes an 80% system performance ratio. Wind or solar runs the same comparison for every county.

How this is worked out

Wind is NASA's Power climate record, the 2001-2025 average at 10 m and 50 m for the county's centre, carried to 30 m with this county's own measured wind shear and spread into hours with a Rayleigh distribution. The turbine is a generic 10 kW, 7 m rotor machine with 10% losses. Cost is $10,000 per kW installed with no tax credit, because the federal one ended in 2025. One county-centre number cannot see your hilltop or your tree line, so treat it as the starting point for a site survey, not a substitute. The full method and its weak spots are in how the numbers are made.